Marte Fodstad

Marte Fodstad

Auto-generated profile, based on publicly available information

Marte Fodstad

SINTEF Energy Research, Trondheim, Norway

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 February 2022 in Renewable and Sustainable Energy Reviews
Verified
Journal Article
Open access
MFMarte Fodstad
Marte Fodstad
PGPedro Crespo del Granado
Pedro Crespo del Granado
LHLars Hellemo
Lars Hellemo
BKBrage Rugstad Knudsen
Brage Rugstad Knudsen
PPPaolo Pisciella
Paolo Pisciella
JSJulian Straus
Julian Straus

1 June 2016
Verified
Conference Paper
Closed access
MFMarte Fodstad
Marte Fodstad
AHArild Helseth
Arild Helseth
AHArild Lote Henden
Arild Lote Henden
We present a hydropower scheduling model for coordinated trade in the day-ahead and balancing market with alternative ways to represent generator start/stop decisions. A case study on a branch of a Norwegian water course is conducted, with analysis going in two directions: how does the start/stop feature influence the added value of balancing market trade as opposed to day-ahead trading only, and how well do the alternative start/stop modeling versions perform with and without balancing market trade. The results indicate that the added value of balancing market trade is small, and relatively insensitive to the choice of start/stop modeling. A linear approximation of start/stop gives a good approximation of the expected profit, but frequently present non-implementable operational decisions.