17 January 2020 in IEEE Transactions on Energy Conversion
Due to the high integration of renewable energy, the power systems may become more susceptible to unbalanced grid voltages, grid frequency disturbances, harmonic resonances and others. Therefore, several works have pointed out that the ancillary services provided by the energy storage systems can minimize these issues. The combination of energy storage and static synchronous compensators (ES-STATCOM) has been proposed to reduce the cost. Modular multilevel converters (MMC) are featured as a good solution for ES-STATCOM realization, due to their high efficiency, modularity and inherent fault-tolerant structure. However, the study of the integration of the MMC based ES-STATCOM in a complex power system composed of power electronic converters, transmission system, renewable plants, transformers, etc, leads to a high computational burden. Therefore, this work presents a detailed design and implementation of three efficient simulation models of the MMC ES-STATCOM. The performance of these models compared during a grid frequency support case study by a 100 MVA/33 kV ES-STATCOM. In addition, the performance of these models is evaluated during a battery charging process and a grid symmetrical fault. The models are compared through the following aspects: processing time, normalized integral of absolute error, state-of-charge estimation and active and reactive power dynamic response.
20 October 2020 in IEEE Transactions on Industry Applications
In recent years, the combination of battery energy storage systems and static synchronous compensators in a single device, known as ES-STATCOM, has been studied by both academia and industry. The modular multilevel converter (MMC) is an interesting candidate for ES-STATCOM realization. The integration of batteries based on dc/dc converter presents advantages in terms of design flexibility. However, there is a gap in the literature in terms of design and cost-optimization of ES-STATCOM systems. To fill this void, this paper provides a methodology to support engineers to design and perform cost-optimization of ES-STATCOM systems. Both capital expenditures (CAPEX) and operational expenditures (OPEX) due to energy losses and battery replacement are taken into account. The methodology identifies what is the optimum submodule voltage reference which minimizes the ES-STATCOM total cost for a given target of operating time. A lifetime model is employed to predict if battery replacement is required. This model computes the battery capacity fade caused by the operation mission profile considering both calendar and cycling aging mechanisms. The case study is based on a 25 MVA/75 MWh ES-STATCOM connected to a 34.5 kV grid, which provides ancillary services for a photovoltaic (PV) power plant. Different rated blocking voltages are assumed for the semiconductor devices. Moreover, different maximum and minimum allowed state-of-charge (SOC) are adopted in the converter design. The proposed methodology can also be used to find the optimum combination of the battery and IGBT part-numbers based on a given initial set.
13 January 2024 in Electric Power Systems Research
14 June 2024 in Eletrônica de Potência
WBWallace Do Couto Boaventura
Wallace Do Couto Boaventura
Battery Energy Storage Systems (BESS) can provide several ancillary services to renewable energy-dominated power systems. However, the choice of the battery employed in the projects is not a straightforward task, since there are several criteria that should be taken into account. Thus, six criteria are considered in this work: the system dc-link voltage, battery lifetime, battery bank volume, battery bank power losses, battery bank price and storage capacity index. The last criterion is related to the BESS energy storage capacity during one-year mission profile operation, which depends on the battery selected for the project. The Multiple Criteria Decision Making (MCDM) is used to choose the best battery based on the relative importance between the Operational Expenditure (OPEX) and Capital Expenditure (CAPEX) concepts. The methodology proposed in this work was applied to 27 batteries composed by lead-acid and Li-ion batteries aiming to select the best solution for a Photovoltaic (PV) system with storage energy based on the peak shaving operation mode. Considering the CAPEX with more relative importance, a lead-acid battery bank was found to be the best solution. On the other hand, when the OPEX is considered more important, a Li-ion battery bank was selected as the best solution.
15 April 2025 in Eletrônica de Potência
Power electronic systems include many fragile elements, with power devices being the most prone to failure. Cycle counting algorithms are essential to evaluate power devices degradation and system reliability. Among the available options, the rainflow algorithm is the most widely used. Since the rainflow algorithm was originally designed for fatigue analysis, it faces challenges when applied to power devices. Specifically, the conventional rainflow algorithm cannot compute the effective heating time and the time-dependent equivalent mean temperature of the thermal cycles. Additionally, it counts cooling half-cycles, which contradicts the basis of lifetime models, as these models rely on data associated with heating temperature gradients. To address these limitations, this work introduces a modified rainflow algorithm for cycle counting in the lifetime estimation of power devices. This methodology enhances the conventional rainflow by enabling the calculation of effective heating time and mean temperature while also filtering out cooling half-cycles. The results demonstrate that the modified rainflow algorithm significantly affects the lifetime predictions for all critical joints in an IGBT module, regardless of the mission profile. Across all case studies, the utilization of the modified rainflow algorithm resulted in a damage reduction exceeding 53\%. %.