Electric grid codes are expected to change in near future to accommodate an increased number of distributed generation units in the distribution power system without impairing its power quality. It is desired that the generators remain connected during voltage sags and provide ancillary services, such as voltage and reactive power control, ensuring the operational stability of the power system. This paper explores how the existing strategies for active and reactive power injection impact the operation of grid-tied inverters in terms of required power, current flowing and reduction of active power delivery during the voltage sags. Such inputs are relevant to properly size converters for operation under fault events. In addition, this paper contributes to devise ${1}$ ) constant peak current control, ${2}$ ) constant active current control and ${3}$ ) constant average active power control strategies for three-phase four-wire grid-tied inverters considering the natural (abc) reference frame. The design and implementation of the investigated power injection strategies are discussed, and their effectiveness and technical viability are analyzed through dynamic computational simulations under symmetrical/asymmetrical voltage sags, and variation of the short-circuit ratio.
1 October 2020 in International Journal of Electrical Power & Energy Systems
Resumo Com a expansão dos sistemas fotovoltaicos (FV) no país, boas práticas para operação e manutenção (O&M) de usinas fotovoltaicas vêm sendo implementadas. Nota-se, contudo, uma lacuna de conhecimentos sobre essa questão. Procedimentos para identificação e prevenção de falhas têm auxiliado na busca por melhor desempenho, segurança e disponibilidade desses sistemas. Este trabalho apresenta métodos para inspeção termográfica e limpeza de módulos FV além de cálculo de perdas na geração. O estudo foi conduzido em usinas FV do Instituto Federal de Minas Gerais (IFMG), nos campi de Betim, e de Congonhas. Os valores de geração foram obtidos em sistemas de aquisição de dados das usinas. Por meio da inspeção termográfica qualitativa identificou-se que 12,7% dos módulos da usina de Betim apresentaram pontos de sobreaquecimento. Com a limpeza desse sistema, pôde-se estimar perdas de geração, pela sujidade dos módulos, de até 22,25%. Em Congonhas, essas perdas chegaram a 56,86%, possivelmente influenciadas pela poluição atmosférica. Com os resultados obtidos, nota-se a importância da manutenção preventiva e do monitoramento dos sistemas, na busca por maior durabilidade e desempenho energético das usinas FV.
Many educational institutions do not have sufficient resources to acquire expensive devices to make the dialoged and practical classes more attractive, both for students and for teachers. In view of these concerns, it is proposed a procedure that integrates PBL (Problem based Learning) and NIL (Hardware in The Loop) methods to test different dynamic systems, verify stability of the implemented control equations, or even validate useful algorithms in many areas, from basic disciplines of Exact Sciences to Technical and Engineering courses. The conception approach is presented here to justify the best possible cost-effectiveness benefits to simulate real-time systems, with financial and time reductions. The project consists of developing three prototypes (heat exchanger, electronic converter and "Beam and Ball" experiment) by means of a mathematical modeling using the Matlab / Simulink software, to embedded this model in a HIL hardware in order to simulate / diagnose the performance of such systems. These examples can be used in both practical and theoretical classes, in order to encourage students to deal with real problems in search of their solutions.