Deon Bester

Deon Bester

Auto-generated profile, based on publicly available information

Deon Bester

Southern African Large Telescope Foundation, Observatory, 7935 Cape Town, South Africa

Research Focus & Metrics

Academic Career Length

23Years (2004-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 September 2006 in Monthly Notices of the Royal Astronomical Society
Verified
Journal Article
Open access
PDF file
DOD. O'DOnoghue
D. O'DOnoghue
DBD. A. H. Buckley
D. A. H. Buckley
LBLuis Balona
Luis Balona
DBD. Bester
D. Bester
LBL. Botha
L. Botha
FWF. Van Wyk
F. Van Wyk
We describe briefly the properties of the recently completed Southern African Large Telescope (SALT), along with its first light imager SALTICAM. Usi

15 September 2004
Verified
Conference Paper
Closed access
GSGerhard Swart
Gerhard Swart
DBDeon Bester
Deon Bester
JBJanus Brink
Janus Brink
CGClifford Gumede
Clifford Gumede
HSHendrik J. Schalekamp
Hendrik J. Schalekamp
The successful development of any complex control system requires a blend of good software management, an appropriate computer architecture and good software engineering. Due to the large number of controlled parts, high performance goals and required operational efficiency, the control systems for large telescopes are particularly challenging to develop and maintain. In this paper the authors highlight some of the specific challenges that need to be met by control system developers to meet the requirements within a limited budget and schedule. They share some of the practices applied during the development of the Southern African Large Telescope (SALT) and describe specific aspects of the design that contribute to meeting these challenges. The topics discussed include: development methodology, defining the level of system integration, computer architecture, interface management, software standards, language selection, user interface design and personnel selection. Time will reveal the full truth, but the authors believe that the significant progress achieved in commissioning SALT (now 6 months from telescope completion), can largely be attributed to the combined application of these practices and design concepts.