Yong-In Kim

Yong-In Kim

Auto-generated profile, based on publicly available information

Yong-In Kim

NOW Consulting Engineers co. LTD, Seoul 05073, Korea

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
15 October 2019 in Energies
Verified
Journal Article
Open access
PDF file
JSJihyun Shin
Jihyun Shin
YKYong-In Kim
Yong-In Kim
Young-Hum ChoYoung-Hum Cho
Young-Hum Cho
As the global energy trend continues, the importance of energy savings and efficient use is being emphasized, and the installation and operation of geothermal heat pump systems is increasing. In many buildings, where an actual geothermal heat pump system has been installed, problems of efficiency deterioration occur frequently because of the inefficient operation after installation of the heat pump system. The purpose of this study was to develop and verify the operating method for energy saving and performance improvement of multiple geothermal systems. A coefficient of performance (COP) prediction model using an artificial neural network for real-time COP predictions was developed. The operating method of a multi-geothermal heat pump system using a variable water flow rate control method and COP prediction model was developed. The geothermal heat pump system operates sequentially depending on the water flow rate of the circulation pump. The COP prediction model enabled real-time performance prediction during system operation. The circulation water flow rate was reduced by up to 29% compared to the existing operating method. Approximately 23% of the energy was saved. The COP system, including the consumption power of the circulation pump, was improved.

13 October 2020 in Energies
Verified
Journal Article
Open access
PDF file
JSJihyun Shin
Jihyun Shin
YSYoon-Bok Seong
Yoon-Bok Seong
YKYong-In Kim
Yong-In Kim
Young-Hum ChoYoung-Hum Cho
Young-Hum Cho
The installation and operation of geothermal systems increased due to the expectation of good cooling and heating performance due to stable heat source temperatures. In actual geothermal system operations, heat source temperature rises or falls due to an imbalance of heating and cooling energy usage. Problems of source side temperature result in reduced geothermal system performance. The purpose of this study is to develop hybrid geothermal system operation technology to stabilize temperature and improve system performance by utilizing auxiliary heat source system. The auxiliary heat source system is operated by comparing the performance when operating the geothermal heat pump system alone and the performance when operating the hybrid geothermal heat pump system. The performance of a hybrid geothermal system is determined by the circulating water temperature of the geothermal system and the circulating water temperature of the auxiliary heat source system. Hybrid geothermal heat pump system performance is predicted through numerical analysis and collection of hybrid geothermal system performance data at various temperature ranges through field test. An operating method was developed using the predicted performance as the changeover operating point of the hybrid geothermal heat pump system. When applying the development and operation technology, it handled about 11% more load than the existing geothermal system operation. The addition of an auxiliary heat source increases the initial investment cost compared to the existing geothermal system, but decreases energy consumption, confirming that the initial investment cost of 15.3 years is recovered.