Geoffrey A. Chua

Geoffrey A. Chua

Auto-generated profile, based on publicly available information

Geoffrey A. Chua

Nanyang Business School, Nanyang Technological University, Singapore

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2010 in Operations Research
Verified
Journal Article
Closed access
Mabel C. ChouMabel C. Chou
Mabel C. Chou
GCGeoffrey A. Chua
Geoffrey A. Chua
CTChung-Piaw Teo
Chung-Piaw Teo
HZHuan Zheng
Huan Zheng
The concept of chaining, or in more general terms, sparse process structure, has been extremely influential in the process flexibility area, with many large automakers already making this the cornerstone of their business strategies to remain competitive in the industry. The effectiveness of the process strategy, using chains or other sparse structures, has been validated in numerous empirical studies. However, to the best of our knowledge, there have been relatively few concrete analytical results on the performance of such strategies vis-á-vis the full flexibility system, especially when the system size is large or when the demand and supply are asymmetrical. This paper is an attempt to bridge this gap. We study the problem from two angles: (1) For the symmetrical system where the (mean) demand and plant capacity are balanced and identical, we utilize the concept of a generalized random walk to evaluate the asymptotic performance of the chaining structure in this environment. We show that a simple chaining structure performs surprisingly well for a variety of realistic demand distributions, even when the system size is large. (2) For the more general problem, we identify a class of conditions under which only a sparse flexible structure is needed so that the expected performance is already within ϵ optimality of the full flexibility system. Our approach provides a theoretical justification for the widely held maxim: In many practical situations, adding a small number of links to the process flexibility structure can significantly enhance the ability of the system to match (fixed) production capacity with (random) demand.

1 October 2011 in Operations Research
Verified
Journal Article
Closed access
Mabel C. ChouMabel C. Chou
Mabel C. Chou
GCGeoffrey A. Chua
Geoffrey A. Chua
CTChung-Piaw Teo
Chung-Piaw Teo
HZHuan Zheng
Huan Zheng
We examine how to design a flexible process structure for a production system to match supply with demand more effectively. We argue that good flexible process structures are essentially highly connected graphs, and we use the concept of graph expansion (a measure of graph connectivity) to achieve various insights into this design problem. Whereas existing literature on process flexibility has focused on the expected performance of process structure, we analyze in this paper the worst-case performance of the flexible structure design problem under a more general setting, which encompasses a large class of objective functions. Chou et al. [Chou, M. C., G. Chua, C. P. Teo, H. Zheng. 2010. Design for process flexibility: Efficiency of the long chain and sparse structure. Oper. Res. 58(1) 43–58] showed the existence of a sparse process structure that performs nearly as well as the fully flexible system on average, but the approach using random sampling yields few insights into the nature of the process structure. We show that the ψ-expander structure, a variant of the graph expander structure (a highly connected but sparse graph) often used in communication networks, is within ϵ-optimality of the fully flexible system for all demand scenarios. Furthermore, the same expander structure works uniformly well for all objective functions in our class. Based on this insight, we derive design guidelines for general nonsymmetrical systems and develop a simple and easy-to-implement heuristic to design flexible process structures. Numerical results show that this simple heuristic performs well for a variety of numerical examples previously studied in the literature and compares favourably even with the best solutions obtained via extensive simulation and known demand distribution.

1 April 2017 in International Journal of Production Economics
Verified
Journal Article
Closed access
GCGeoffrey A. Chua
Geoffrey A. Chua
RMReza Mokhlesi
Reza Mokhlesi
ASArvind Sainathan
Arvind Sainathan

1 December 2010 in European Journal of Operational Research
Verified
Journal Article
Closed access
Mabel C. ChouMabel C. Chou
Mabel C. Chou
GCGeoffrey A. Chua
Geoffrey A. Chua
CTChung-Piaw Teo
Chung-Piaw Teo

1 April 2014 in Operations Research
Verified
Journal Article
Closed access
Mabel C. ChouMabel C. Chou
Mabel C. Chou
GCGeoffrey A. Chua
Geoffrey A. Chua
HZHuan Zheng
Huan Zheng
Production postponement, the strategy to hold reserved production capacity that can be deployed based on actual demand signals, is often used to mitigate supply-demand mismatch risk. The effectiveness of this strategy depends crucially on the ease, or flexibility, in deploying the reserved capacity to meet product demands. Existing literature assumes that the reserved capacity is fully flexible, i.e., capable of being deployed to meet the demand of any item in a multiproduct system. Little is known if reserved capacity is held at many different locations, with each location having only a limited range of flexibility on production options. This paper examines how effective the production postponement strategy is in this environment. When the amount of reserved capacity is small (i.e., postponement level near 0%), no amount of flexibility can reap significant benefits. When the reserved capacity is high (i.e., postponement level near 100%), it is well known that a sparse structure such as a 2-chain can perform nearly as well as a fully flexible structure. Hence, process flexibility beyond 2-chain has little impact on the effectiveness of production postponement strategy in these two extreme environments. Interestingly, in a symmetric system, we prove that the performance of 2-chain, vis-à-vis the full flexibility structure, has a wider gap when postponement level (i.e., amount of reserved capacity) is moderate, and thus process flexibility beyond 2-chain matters and affects appreciably the performance of the production postponement strategy. Fortunately, adding a little more flexibility, say turning a 2-chain into a 3-chain, the system can perform almost as well as a full flexibility structure for all postponement levels. This is important as first stage production capacity can be allocated as if the reserve capacity is fully flexible. Our analysis hinges on an exact analytical expression for the performance of d-chain, obtained from solving a related class of random walk problems. To the best of our knowledge, this is the first paper with analytical results on the performance of d-chain for d > 2.

5 May 2023 in Social Choice and Welfare
Verified
Journal Article
Closed access
PDF file
GCGeoffrey A. Chua
Geoffrey A. Chua
GHGaoji Hu
Gaoji Hu
FLFang Liu
Fang Liu