Jiawei Lyu

Jiawei Lyu

Auto-generated profile, based on publicly available information

Jiawei Lyu

Key Laboratory of Control of Power Transmission and Conversion, Ministry of Education, Shanghai Jiao Tong University, Shanghai, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
26 January 2021 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
JLJiawei Lyu
Jiawei Lyu
SZShenxi Zhang
Shenxi Zhang
HCHaozhong Cheng
Haozhong Cheng
KYKai Yuan
Kai Yuan
YSYi Song
Yi Song
SFSidun Fang
Sidun Fang
This article proposes a novel optimal sizing method for the energy station in the multienergy system (MES) integrated with data center. First, an overall framework of the energy station, data center, and multienergy loads is constructed to describe the interconnection of energy system and information system. Then, the dynamic voltage frequency scaling (DVFS) technique, the thermal inertia, and the deep coupling relationships of the electricity load, waste heat, cooling load, and workload in the data center are respectively modeled. On this basis, the optimal sizing model of the energy station is established, in which the data center can participate in the integrated demand response by the DVFS technique and thermal inertia. The capacity of energy station and the scheduling schemes of energy devices and servers are optimized simultaneously to coordinate the energy flow and information flow. Based on the quasi-steady-state assumption of thermal balance, the model is simplified to a mixed-integer quadratic program problem, and it is solved by Gurobi. Case studies based on a real-world test system in China illustrate that the integration of data center can be utilized to reduce the total cost of energy station planning in MES.

2 July 2021 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
SZShenxi Zhang
Shenxi Zhang
SWShuping Wang
Shuping Wang
ZZZhenyuan Zhang
Zhenyuan Zhang
JLJiawei Lyu
Jiawei Lyu
HCHaozhong Cheng
Haozhong Cheng
QZQingping Zhang
Qingping Zhang
Probabilistic multienergy flow (PMEF) analysis is the fundamental of planning and operation of integrated energy systems (IES) considering uncertainties. The injection of hydrogen will make the PMEF calculation more complex and can deeply affect the distribution of energy flows. This article studies an efficient PMEF calculation method which can obtain the probabilistic information of electricity–gas IES with hydrogen injection. First, the steady-state model of electricity–gas IES with hydrogen injection is established, in which the gas network with hydrogen injection is formulated in compact matrix form. Second, the Jacobian matrix for the steady-state model of electricity–gas IES with hydrogen injection is derived. Third, the cumulant method and Nataf transformation are applied to calculate the PMEF considering the correlations. Finally, case studies are carried out on a coupled IES, which consists of modified IEEE 33-bus electricity system and 11-node gas system. The results demonstrate that the proposed PMEF method can reduce computational time greatly while keeping high computational accuracy when compared with the Monte–Carlo simulation method.

17 July 2023 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
SZShenxi Zhang
Shenxi Zhang
JLJiawei Lyu
Jiawei Lyu
WJWenguang Jin
Wenguang Jin
HCHaozhong Cheng
Haozhong Cheng
CLCanbing Li
Canbing Li
Xu WangXu Wang
Xu Wang
With the digitalization of energy systems, data centers are gradually becoming an integral part of energy hubs (EHs). Considering the spatiotemporal load regulation of data centers, this article proposes a novel multi-stage coordinated planning model for multiple EHs, which can co-optimize the structure and capacity of each EH, as well as interconnected lines and pipes among multiple EHs. First, a digraph-based computerized modeling method is developed to describe the structures of different EHs. Then, the workload allocation, multi-energy consumption, and service quality of data centers are modeled in sequence to illustrate the tight coupling relationships of energy flow and workload flow. On this basis, the coordinated planning model of multiple EHs is established with the objective function of minimizing the total cost, which is mainly subjected to the constraints of energy device selection, inside topology design, multi-energy load balance, workload balance, and risks. Case studies are carried out on a test system in north China to verify the effectiveness of the proposed planning method.

2 January 2022 in Energy
Verified
Journal Article
Closed access
JLJiawei Lyu
Jiawei Lyu
SZShenxi Zhang
Shenxi Zhang
HCHaozhong Cheng
Haozhong Cheng
KYKai Yuan
Kai Yuan
YSYi Song
Yi Song

7 April 2021
Verified
Conference Paper
Closed access
XCXiuwen Cai
Xiuwen Cai
MCMaoxin Chen
Maoxin Chen
KLKeyao Lin
Keyao Lin
JLJiawei Lyu
Jiawei Lyu
SZShenxi Zhang
Shenxi Zhang
CHCheng Haozhong
Cheng Haozhong
Nowadays, with the worldwide attention on renewable energy, the grid-connected photovoltaic (PV) equipment is playing a significant role in the active distribution network (ADN). This paper proposes a novel day-ahead optimal dispatch model for ADN based on the conditional value at risk (CVaR) to promote solar power accommodation. Firstly, the uncertainties of PV output and load are modeled by the generated typical scenarios based on historic data and K-means clustering and can be embedded in the discretized and linearized CVaR model. Then, the optimal dispatch model aimed to maximize solar power accommodation is established. Active management (AM) includes the on-load tap changer, capacitor bank, battery energy storage, and load curtailment. Constraints mainly involve power flow, nodal voltage, branch power load, and the limits of AM. The problem is finally transferred into a mixed-integer second-order cone programming one, which can be solved by the commercial solver Gurobi directly based on the branch-and-bound method. Case studies based on a modified IEEE 33-bus system illustrate the feasibility and validity of the proposed method.