1 April 2018 in Tunnelling and Underground Space Technology
1 January 2019 in Shock and Vibration
It is essential to control the damage to the surrounding rock and engineering structures in the process of cut blasting with a single free surface in underground mining. To reduce vibration induced by cut blasting, this paper proposes short‐delay cut blasting, in which blast holes that are near each other are sequentially initiated with short‐delay times. Experimental tests of cut blasting were conducted in a roadway in the Shaxi copper mine to compare the peak particle velocity (PPV) and frequency characteristics of simultaneous blasting and short‐delay blasting. Numerical modelling was then developed to study the influence of short‐delay times on blast vibration. The accuracy of the numerical simulation was verified by the comparison of the test and simulated data of single‐hole blasting. The results show that the amplitude reduction ratio (ARR) value increases gradually with the increase in delay intervals, and the vibration reduction for delay intervals smaller than 6 ms is very limited, particularly in the near field. The principal frequencies (PFs) for short‐delay blasting are similar to those for simultaneous blasting, which implies that the frequencies do not increase directly with the decrease of the delay intervals. The experimental tests also show that the mean frequencies (MFs) for the 8 ms delay are slightly higher than those for the 0 ms delay blast. In the case of ensuring the rock breaking of cut blasting, longer delay intervals of 8∼10 ms are beneficial to further reduce PPV in practical blasting.
1 January 2018 in Advances in Materials Science and Engineering
Top stemming is necessary to stop the explosive energy from escaping through the upper part of blast‐holes in cutting blasts of large‐diameter deep‐hole blasting in underground mines. The often‐used single soil stemming frequently leads to material clogging which results in reduction of blasting efficiency. In this paper, a new water‐soil composite stemming is proposed to solve the problem. A series of small‐scale tests were conducted on solid concrete masonry blocks to investigate the effect of top stemming material and stemming length on blasting performance. The experimental results indicated that water stemming was worse at improving the utilization rate of the explosion energy compared with single soil stemming of the same length. Further, the mean fragment size decreased with the increase of stemming length for single water stemming. Three schemes of water‐soil composite stemming were designed and the scheme with soil in the lower part and water filled in bags in the higher part had the best fragmentation. The water‐soil composite stemming was applied in underground stopes, and field results indicated that the newly proposed stemming led to similar rock fragmentation with traditional single soil stemming, but greatly reduced the clogged blast hole ratio, thus effectively improving blasting and mining efficiency.