Based on LS‐DYNA numerical simulation analysis and comparison with laboratory tests, the blasting crack development dynamic evolution mechanism of elliptical bipolar linear shaped charge is analyzed. The development law of rock crack and optimal radial decoupling coefficient under different blast hole diameters were studied. The results revealed that the blasting with elliptical bipolar linear shaped charge had a remarkable effect on the directional crack formation, and the maximum effective stress of rock close to the position of shaped charge in the direction of concentrating energy is about 2.3 times of that in the direction of nonconcentrated energy. Moreover, the directional crack could be formed by blasting with elliptical bipolar linear shaped charge with different hole diameters, whilst the length of the main crack was related to the radial decoupling coefficient. Particularly, the main crack reached the longest when the radial decoupling coefficient was 3.36.
Seeking the law of through‐crack in the double hole of shaped charge can help reveal the rock failure mechanism of directional controlled blasting. Using LS‐DYNA numerical simulation analysis, the dynamic mechanical behaviors of double‐hole crack development and double‐hole crack penetration in elliptical bipolar linear‐shaped charge blasting and ordinary blasting were compared and studied. The results showed that it was difficult to form a straight line through the double holes under ordinary blasting, while easy to cause over‐under‐excavation problems. The blasting of the elliptical bipolar linear‐shaped charge had a significant effect on the formation of directional crack. The crack penetrated along the connecting center line of the two holes. The main crack growth form was tensile fracture mode, and the explosion gas was the important driving force for continuous crack growth. The elliptical bipolar linear‐shaped charge blasting produced fewer cracks in the nonenergy‐accumulating direction, which could effectively reduce the damage of the retained rock mass.
20 November 2021 in Arabian Journal of Geosciences
According to the relevant policies and technical requirements, combined with the need for highway engineering quality promotion, the systematic improvement achievements of highway standardization construction are formed in the aspects of project organization and management, technological innovation, and experience exchange utilizing project management standardization, temporary works standardization, process standardization, team process standardization, standardization observation meetings, etc., to guide the establishment of highway quality project.