This paper presents a stochastic bi‐objective model to reduce the operation cost and the carbon emission of a smart railway station along with dependent commercial buildings, according to a multi‐energy hub system's structure. The proposed energy hub system (EHS) includes a power, heating, and cooling subenergy hub. The recovered energy obtained from the regenerative braking (RB) during train deceleration is utilized to supply the load of EHS. To calculate the recovered energy, the motion of trains is simulated in MATLAB software. Furthermore, a demand response program (DRP) is integrated into the model to improve the flexibility of the EHS. Also, the uncertainty related to the photovoltaic generation and the power obtained from RB is considered. GAMS software is used to solve the bi‐objective model with the ɛ‐constraint approach. Then, to select the best possible solution, a fuzzy technique is engaged. Seven case studies are considered investigating the effect of exerting the DRP, utilizing the recovered energy, and employing the energy storage on operation cost and carbon emission. The simulation results demonstrate a significant improvement in operating cost and the carbon emission for the proposed EHS.
11 March 2024 in International Journal of Electrical Power & Energy Systems
This article presents a coordinated operation model for energy management of a multi‐integrated energy system based on Mixed‐Integer Linear Programing (MILP). The power derived by trains from regenerative braking energy (RBE), during deceleration, is utilised to meet the interconnected energy hubs’ (IEHs) demand. The recovered energy is calculated by simulating the motion of the trains in MATLAB software. The electricity and heat demand response (DR) programs are integrated into the proposed model to study their impacts on the operating cost and the carbon emission of the IEH, considering several case studies. Furthermore, the uncertainties of the RBE, photovoltaic power generation, and loads of the IEH are considered by formulating the optimisation problem stochastically through a scenario‐based approach. Therefore, a scenario generation and reduction decision‐making technique is employed. Finally, the GAMS optimisation software is used to assess the efficiency of the presented MILP model. The simulation results indicate that the total operating cost of the IEH reduced 2.0% and 1.4% in the case studies. Also, the CO 2 emission is decreased by about 0.3% by applying the coordination scheme besides the DR programs.
This study presents a multiobjective energy management model for the connected cophase traction power system (CCTPS). Each traction substation (TSS) includes a power flow controller (PFC), energy storage systems (ESS), wind turbine, and PV modules beside a single-phase traction power transformer. Also, in order to exchange the power between the adjacent TSSs, power transfer controllers (PTCs) are used. The proposed energy management model is formulated as a multistage multiobjective optimization problem with a lexicography approach. In the first stage, the cost of purchased energy is minimized. In the second stage, the independence of the CCTPS from the external grid improved. Finally, minimizing the voltage unbalanced ratio (VUR) of CCTPS is considered as the third stage goal. According to the simulation results, utilizing GAMS optimization software, the proposed model will decrease remarkably VUR and dependency of CCTPS without any increase in operation cost.