9 September 2025 in IEEE Journal on Multiscale and Multiphysics Computational Techniques
A 5-MHz sinusoidal signal, a 500-Hz sinusoidal signal, and a DC signal are compared among each other experimentally when they are turned on, after they are established over a piece of long co-axial cable, and when they are turned off. The experimental results do not demonstrate any fundamental differences among the 5-MHz signal, 500-Hz signal, and DC signal in terms of propagation over the co-axial cable. Based on the experimental results, the well-known formulations of AC wave propagation are extended to DC wave propagation. The experimental and theoretical studies of this paper indicate that DC electrical power is transported by electromagnetic wave propagation in practical DC circuits.
10 November 2025 in IEEE Access
Interdependent infrastructures rarely fail in isolation: outages in one network can cascade across layer boundaries and hinder restoration elsewhere. This study links three real-world data sets: an IEEE 118-bus power grid, a CAIDA AS-level Internet snapshot, and the EPANET Net-3 water model into a sparse but asymmetric three-layer “supra-graph.” A hybrid connectivity-and-load failure (CF) rule and a dynamic-budget self-healing (SH) routine then compete on that multiplex. The topological-nearest coupling scheme more than doubles the density of water-to-communication links relative to other off-diagonal blocks, creating a handful of cross-layer hubs that carry 72 percent of all inter-layer traffic. Simulation results show that these hubs deepen the initial cascade dip and prolong recovery: the active-node fraction drops to 0.86 within five steps yet requires roughly twenty steps of healing to regain full functionality. A multi-objective genetic algorithm explores trade-offs among healing budget β, connectivity threshold ϕc, and overload threshold ρc. Sixteen Pareto-optimal solutions trace a concave frontier: raising β from 0.20 to 0.35 yields the same resilience gain as tightening ϕc from 0.60 to 0.75, while further increases in either lever give diminishing returns. A balanced setting (β ≈ 0.30, ϕc ≈ 0.65, ρc ≈ 1.0) restores 80 percent of nodes at minimum cost. The findings highlight how cross-layer asymmetry skews both failure propagation and optimal resource allocation, offering infrastructure operators a quantified basis for sizing repair crews and setting connectivity targets under interdependent risk.