7 December 2021 in International Journal of Disaster Risk Reduction
Verified
Journal Article
Closed access
AAAulina Adamy
Aulina Adamy
Hafnidar A. RaniHafnidar A. Rani
Hafnidar A. Rani

16 November 2018 in International Journal of Construction Management
Verified
Journal Article
Closed access
AAAulina Adamy
Aulina Adamy
ABAbu Hassan Abu Bakar
Abu Hassan Abu Bakar
Developing countries have faced many problems regarding humanitarian reconstructed buildings, especially during occupancy when most donors have left. Hospitals are some of the most important buildings in the disaster-management cycle. Previous studies have shown that there is no specific tool for evaluating post-disaster hospital-building performance. This study aims to test the validity and reliability of a proposed framework of building-performance evaluation (BPE) in a disaster context for public hospitals based on partial least squares (PLS) analysis. The researcher distributed 405 questionnaires to building users in four rebuilt public hospitals in Aceh, Indonesia. The results showed that the hierarchical construct model (HCM) with reflective-reflective relationships and third-order framework comprises 16 criteria; 72 items were valid and reliable, and all path coefficients were considered highly significant. These results reflect the degree of explained variance of third-order in its second-order components: built environment and building user (89%), building system (93%), and disaster-risk management/DRM (85%). DRM as the new variable added to the BPE conceptual model for a post-disaster reconstruction (PDR) context is justified. The confirmed framework can be used to evaluate post-disaster hospital performance in the future. The BPE framework should also be tested in other types of post-disaster hospitals.

16 January 2019 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
AAAulina Adamy
Aulina Adamy
ABAbu Hassan Abu Bakar
Abu Hassan Abu Bakar
Quality continues to be such an issue in humanitarian projects and it is because the model of quality control in normal business is driven by its customers however, does not operate in the aid sector. Evaluation and monitoring in every building life cycle in reconstruction process is important to increase the quality of the aid project. Among all types of public buildings and facilities, hospital is considered as one of the most essential assets in disaster management. However, there is no list of criteria available yet to evaluate post-disaster hospital building performance. The objective of this study is to identify the key criteria for hospital building. A total of 116 respondents are collected from experts of built environment field and high level position staff in grade B hospital in the capital city of Aceh province, Banda Aceh. After conducting Cronbach's alpha coefficient test and factor analysis, total twenty-six criteria were found reliable and valid. Subsequent with the relative importance indices (RII) analysis, this study has come out with the top-fifteen most important criteria for post-disaster reconstruction building performance as in order: safety, health, control of environment impact, easiness, accessibility, engineering, building quality, staff and patient environment, comfort, functionality, building form and material, operational maintenance guideline, local institution capacity, architecture, disaster resilience, and the last criterion is sustainability. It is recommended to use these criteria for hospital building performance evaluation especially in disaster prone area. Future study is need to find out that the same criteria is applicable for other type of buildings and locations.

1 August 2022 in Jurnal Pengabdian Masyarakat Nusantara (JPMN)
Verified
Journal Article
Open access
PDF file
NZNasrul Z.
Nasrul Z.
AAAulina Adamy
Aulina Adamy
Wardiati YusufWardiati Yusuf
Wardiati Yusuf
TTTaufik Taufik
Taufik Taufik
PT. XYZ is a state company located in Lhoknga, Aceh Besar District. Before being able to decide on a corporate social responsibility (CSR) program, a social mapping is needed so that the CSR program is right on target. Social mapping was carried out through the Rapid Rural Appraisal method with in-depth interviews and descriptive analysis. The population is the Meunasah Mesjid village community in Lhoknga District. A total of 20 selected resource persons: village heads, village leaders, mosque priests, youth leaders, PKK (Family Welfare Empowerment) heads, farmers, fishermen, ranchers, tourism business actors, BUMG heads (village-owned enterprises), health cadres, organizational management, women leaders, small businesses, day laborers, and employees of PT. XYZ. The results found that all groups/organizations came from the village itself. Figures have better formal and religious education so they have access to local and even national levels. The main livelihood is generally working in the scope of PT. XYZ as contractor and partner. The rest work as seasonal farmers and cake makers.


17 January 2022 in Elkawnie
Verified
Journal Article
Open access
PDF file
Hafnidar A. RaniHafnidar A. Rani
Hafnidar A. Rani
TSTamalkhani Syammaun
Tamalkhani Syammaun
AAAulina Adamy
Aulina Adamy
AFAri Fadillah
Ari Fadillah
The drainage channel is one of the complementary buildings on the road segment in requiring one of the technical requirements for road infrastructure. The road drainage channels in general are open channels using gravity to drain surface water or inundation to the channel. The distribution of flow in the drainage channel to this channel follows the contours of the highway so that the water will flow easily following gravity. The Several alternatives selection of drainage development technologies include elbow drainage, parallel, grid iron, natural and radial. The problem found that some factor considered in selection the right technology are the construction budget, construction period, material supply, and construction process affecting the selection process become complicated. The purpose of this study is to determine the dominant criteria required in considering the selection of drainage construction technology in Banda Aceh and to determine the proper alternative using Analytical Hierarchy Process (AHP) method. After distributing questionnaires to 16 respondents, the research found that the dominant criterion is the construction period as the score of 0.66. According to the respondents, the construction period become the most vital criteria since the assessment of criteria variable relate to the limitation in complete all drainage proposed. This study founds that the best alternative in selecting drainage construction technology is "parallel drainage" as the score is 4.96. Therefore, this study recommends the use of "parallel drainage" as a priority in the drainage construction Banda Aceh by considering construction budget, construction period, material supply and construction process.Abstrak: Saluran drainase merupakan salah satu bangunan pelengkap pada ruas jalan dalam memenuhi salah satu persyaratan teknis prasarana jalan. Pada umumnya saluran drainase jalan merupakan saluran terbuka yang menggunakan gaya gravitasi untuk mengalirkan air limbah ke outlet. Distribusi aliran di saluran drainase ke outlet ini mengikuti kontur jalan raya sehingga air limbah akan lebih mudah mengalir secara gravitasi. Beberapa alternatif pemilihan teknologi pembangunan drainase antara lain adalah drainase elbow, parallel, gridiron, natural dan radial. Persoalannya, beberapa faktor yang perlu dipertimbangkan dalam memilih teknologi yang tepat, biaya pembangunan, waktu konstruksi, ketersediaan material, dan proses pembangunan sehingga pilihan menjadi rumit. Tujuan dari penelitian ini adalah untuk menentukan kriteria dominan yang perlu diperhatikan dalam pemilihan teknologi pembangunan drainase di Kota Banda Aceh dan menentukan alternatif yang tepat melalui metode Analytical Hierarchy Process (AHP). Setelah menyebarkan kuesioner kepada 16 responden, penelitian menemukan bahwa kriteria yang dominan adalah waktu pengerjaan dengan bobot tertinggi (0,66). Menurut responden, waktu konstruksi merupakan kriteria yang paling penting karena keterbatasan dalam menyelesaikan seluruh usulan pembangunan drainase perlu dipertimbangkan. Studi ini menemukan bahwa alternatif terbaik dalam memilih teknologi pembangunan drainase adalah “drainase paralel” yang memperoleh nilai kinerja tertinggi sebesar 4,96. Oleh karena itu, penelitian ini merekomendasikan penggunaan “drainase paralel” sebagai prioritas dalam pembangunan drainase di Kota Banda Aceh dengan pertimbangan biaya, waktu konstruksi, ketersediaan material, dan proses pembangunan.