Raymond J. Krizek

Raymond J. Krizek

Auto-generated profile, based on publicly available information

Raymond J. Krizek

Stanley F. Pepper Professor of Civil Engineering, Northwestern University, Evanston, Illinois

Research Focus & Metrics

Academic Career Length

29Years (1998-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 1999 in Construction Management and Economics
Verified
Journal Article
Closed access
WLWei Lo
Wei Lo
RKRaymond J. Krizek
Raymond J. Krizek
Ahmad HadaviAhmad Hadavi
Ahmad Hadavi
When designing a set of prequalification requirements, the first objective is to select the basic factors that are deemed appropriate to scrutinize, and the second objective is to establish the threshold for each of these factors to evaluate the capability and capacity of the bidders on a given project; together, these factors and the limits imposed on each constitute the basis for qualifying or disqualifying each of the bidders. To obtain the desired prequalification results and the consequent quality delivery of a project, both selecting the factors and determining the limits for each factor are crucial and must be given careful attention with due consideration of the prevailing environment (including market conditions, deadlines, need for technology transfer, etc.). In this study it was found that an improper design of prequalification requirements seriously affected the progress and cost of projects, provided opportunities for collusion, and encouraged the obtaining of contracts through improper practices. Based on an analysis of data from 30 Taipei Mass Rapid Transit projects, together with information gleaned from numerous interviews with contractors, consultants, and clients, it is shown that a risk-taking attitude by the Government and the establishment of relatively low prequalification requirements would be more conducive to achieving a desirable balance among (a) satisfying the schedule and sequence of contracting, (b) obtaining lower prices by an increase in competition, (c) procuring the timely delivery of a quality project, and (d) fostering the growth of local contractors.

1 May 1998 in Journal of Management in Engineering
Verified
Journal Article
Closed access
WLWei Lo
Wei Lo
CCChian-Hsueng Chao
Chian-Hsueng Chao
Ahmad HadaviAhmad Hadavi
Ahmad Hadavi
RKRaymond J. Krizek
Raymond J. Krizek
It is normal practice for developing countries to use a large industrial or technological project as a means to transfer foreign expertise and experience into the country, and the government of Taiwan has pursued this path in building the Taipei mass rapid transit system (MRTS). To satisfy the foregoing objective, the Department of Rapid Transit System (DORTS) set the following criteria for tendering contracts. Civil works that did not require a high level of technology were channeled to domestic firms. More complex projects were assigned to private and government-owned companies that had accumulated a higher level of expertise because of joint ventures and their active involvement in international projects during the past three decades. The most technically challenging projects are given to international consortia in the form of either joint ventures or technical collaboration agreements with domestic companies. This paper discusses the goals of DORTS during the past several years as they relate to promoting (1) increased domestic input, (2) technology transfer, and (3) a higher level of achievement.

24 July 2000
Verified
Conference Paper
Closed access
RKRaymond J. Krizek
Raymond J. Krizek
MSMichael J. Spino
Michael J. Spino
In this study, a field sand deposit was grouted with a sodium silicate grout, allowed to cure in situ, excavated, and cut with a water jet into handleable blocks. These blocks were then transported to the laboratory and hand-trimmed or machine-cored to obtain test specimens. The measured permeability, modulus, and strength values for these specimens were used to determine the spatial and directional dependence of these engineering properties in the in situ grouted mass. Then sodium hydroxide was used to dissolve the grout and recover the weight of sand in a given volume, thereby providing an assessment of the grout content and original dry density at particular points in the deposits. Notwithstanding considerable scatter in the data, there were modest indications of anisotropy but no clearly identifiable changes in the engineering properties with distance (up to about 1.6 meters) from the grout injection point. Cored specimens showed little, if any, variations in strength or modulus relative to hand-trimmed specimens, but the strength and modulus of the field-grouted specimens were significantly higher than those of laboratory-prepared specimens using the same grout mix and sands.

1 August 2005
Verified
Conference Paper
Closed access
YZYingchun Zhang
Yingchun Zhang
DNDavid Novick
David Novick
Ahmad HadaviAhmad Hadavi
Ahmad Hadavi
RKRaymond J. Krizek
Raymond J. Krizek
This paper presents an analysis of life cycle costs for four bridges and two tunnels constructed and operated by the Port Authority of New York and New Jersey. Cost components include the initial cost, repair and rehabilitation costs, and annual maintenance costs. Results show that the maintenance and rehabilitation costs, as a percentage of the initial cost, are reasonably similar for both bridges and tunnels for perhaps the first 65 years of their service life, after which these costs increase significantly for bridges. However, based on cost per square foot and cost per traffic lane, the opposite is clearly true. Only time and detailed cost records for ensuing years will reveal how the two types of structure compare over their entire service lives.