1 September 1999 in Construction Management and Economics
When designing a set of prequalification requirements, the first objective is to select the basic factors that are deemed appropriate to scrutinize, and the second objective is to establish the threshold for each of these factors to evaluate the capability and capacity of the bidders on a given project; together, these factors and the limits imposed on each constitute the basis for qualifying or disqualifying each of the bidders. To obtain the desired prequalification results and the consequent quality delivery of a project, both selecting the factors and determining the limits for each factor are crucial and must be given careful attention with due consideration of the prevailing environment (including market conditions, deadlines, need for technology transfer, etc.). In this study it was found that an improper design of prequalification requirements seriously affected the progress and cost of projects, provided opportunities for collusion, and encouraged the obtaining of contracts through improper practices. Based on an analysis of data from 30 Taipei Mass Rapid Transit projects, together with information gleaned from numerous interviews with contractors, consultants, and clients, it is shown that a risk-taking attitude by the Government and the establishment of relatively low prequalification requirements would be more conducive to achieving a desirable balance among (a) satisfying the schedule and sequence of contracting, (b) obtaining lower prices by an increase in competition, (c) procuring the timely delivery of a quality project, and (d) fostering the growth of local contractors.
1 May 1998 in Journal of Management in Engineering
It is normal practice for developing countries to use a large industrial or technological project as a means to transfer foreign expertise and experience into the country, and the government of Taiwan has pursued this path in building the Taipei mass rapid transit system (MRTS). To satisfy the foregoing objective, the Department of Rapid Transit System (DORTS) set the following criteria for tendering contracts. Civil works that did not require a high level of technology were channeled to domestic firms. More complex projects were assigned to private and government-owned companies that had accumulated a higher level of expertise because of joint ventures and their active involvement in international projects during the past three decades. The most technically challenging projects are given to international consortia in the form of either joint ventures or technical collaboration agreements with domestic companies. This paper discusses the goals of DORTS during the past several years as they relate to promoting (1) increased domestic input, (2) technology transfer, and (3) a higher level of achievement.