Wei Wang

Wei Wang

Auto-generated profile, based on publicly available information

Wei Wang

College of Safety Science and Engineering

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
WWWei Wang
Wei Wang
ZLZongxiang Li
Zongxiang Li
HYHongming Yu
Hongming Yu
This study introduced gas control technology in goaf using adjacent roadway large‐diameter (550 mm) boreholes to control gas accumulation in the upper corner of a fully mechanized working face in high‐gas coal seams. The gas control process in the upper corner and gas interception in goaf by large‐diameter boreholes was analyzed using the CFD model of the gas flow in goaf. The latter considered the control equation of gas flow, the established permeability model of goaf, and the gas emission law in goaf. Using the 2‐105 working face of the Tenghui Coal Mine, Shanxi Province, China, as a case study, the distribution patterns of gas concentration and flow field in the goaf for various extraction flow parameters and different positions of boreholes were numerically simulated. The dependences between various locations, drainage flows, and the gas concentration in the upper corner were determined and fitted by engineering equations. The evolution pattern of the spontaneous combustion zone in the goaf under the drainage conditions was also analyzed. The optimal borehole configuration parameters ensuring the extraction flow rate exceeding 3 m·s−1 and the effective gas control in the upper corner of the working face at a distance of 5 m–15 m behind the working face were identified. The engineering practice proved the feasibility of gas control in the goaf using the adjacent roadway large‐diameter borehole. The gas concentrations in the return airflow and the upper corner of the working face were kept below 0.65 and 0.8%, respectively, to ensure production safety and improve the gas utilization efficiency.

1 January 2022 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
WWWei Wang
Wei Wang
ZLZongxiang Li
Zongxiang Li
GZGuangmin Zhao
Guangmin Zhao
YCYujin Chen
Yujin Chen
The upper corner gas overrun caused by goaf gas gushing in the high‐gas mine can be mitigated by roof positioning of long boreholes in the goaf fracture zone, creating an artificial gas migration channel and achieving safe comining of coal and gas. This study numerically simulated the fracture evolution in the coal rock overlying goaf in workface #2‐104 of the Detong Mine, China. Using the O‐shaped circle theory and the FLAC3D commercial software package, the range parameters of goaf fracture zone gas‐concentrated areas were obtained by defining the pressure relief coefficient, which provided a basis for the arrangement of holes in the goaf located at 15 m from the workface goaf collapse zone to the workface floor and 15–60 m from the structure zone to the workface. According to the obtained goaf parameters, the distribution and migration law in the goaf under the conditions of initial state and extraction with different roof borehole parameters were simulated by the FLUENT software. The optimal borehole location was 30 m from the floor and 25 m from the return airway. The field experiment with three boreholes arranged in the optimal extraction position provided the extraction concentration in the borehole above 30%, the gas extraction volume of 12 m3·min−1, and the concentration at the upper corner below 1%, which ensured safe coal and gas comining.

1 March 2021 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
THTing Hu
Ting Hu
JZJinhao Zhang
Jinhao Zhang
QLQingshan Li
Qingshan Li
WWWei Wang
Wei Wang
JLJia Liu
Jia Liu
The geological structure of Chongqing area is complex, many small and mediumsized faults are developed in the axis of anticline fold, and there are many structural fissures in rock strata, and karst landform is developed in some areas. With the development of economy, the construction of underground engineering is increasing, which leads to the rapid decline of groundwater and construction vibration, resulting in a large number of uneven ground settlement, and the formation of ground fissures. This paper introduces the various forms of ground fissures, analyzes the formation process of uneven ground settlement area in the process of underground engineering construction, establishes the stress model of soil surface cracks based on the fracture mechanics theory of cohesive soil cracks, uses the fracture judgment of I-II composite cracks to determine whether the cracks expand or not, and uses the formula of soil cracking angle to calculate its propagation direction, and preliminarily explains the fracture mechanism of soil in the ground fissure area. It provides reference for the further study of corresponding disaster mechanism.