1 December 2011 in European Journal of Operational Research
1 January 2019 in Operations Research
We consider a firm expanding its production capacity in stages under uncertainty. The firm decides on the investment times and the size of the investment lumps. This setting gives rise to an impulse control problem for which we derive a quasi-variational inequality that involves two state variables: a stochastic price process and a controlled capacity process. We provide a general verification theorem and construct an optimal two-dimensional (s,S)-type policy for a specific case. The firm “waits and sees” before investing until the perpetuity value of newly installed capacity exceeds the total opportunity cost by a sufficient margin. Our model generalizes extant models dealing with “the option to expand” capacity and makes predictions of both the optimal investment timing and the optimal scale of production.
18 January 2019 in Production and Operations Management
We develop a model of oligopoly competition involving innovation effort, market entry and production flexibility under demand uncertainty. Several heterogeneous firms make efforts to develop new prototypes; if they succeed, they hold a shared option to enter a new market under stochastic demand. We derive analytic results for the Markov perfect equilibrium accounting for development effort, market entry and production decisions and complement these by numerical analyses. Firm value—which embeds real options—is not convex increasing in demand but exhibits “competitive waves” due to market entries by rivals. A firm with a development advantage (“innovator”) exerts greater innovation effort if the market is a niche, whereas another benefiting from economies of scale (“incumbent”) invests more if the market is larger. Positive externalities benefit the incumbent in the development stage, whereas the innovator is better off in counteracting negative externalities. Demand volatility raises firm incentives to innovate as it enhances the value of firm market‐entry and production flexibility.
1 January 2024 in Mathematical Control and Related Fields
We provide an overview of continuous-time processes subject to jumps that do not originate from a compound Poisson process, but from a compound Hawkes process. Such stochastic processes allow for a clustering of self-exciting jumps, a phenomenon for which empirical evidence is strong. Our presentation, which omits certain technical details, focuses on the main ideas to facilitate applications to stochastic control theory. Among other things, we identify the appropriate infinitesimal generators for a set of problems involving various (possibly degenerate) cases of diffusions with self-exciting jumps. Compared to higher-dimensional diffusions, we note a degeneracy of the second-order infinitesimal generator. We derive a Feynman-Kac Theorem for a dynamic system driven by such a jump diffusion and also discuss a problem of continuous control of such a system and provide a verification theorem establishing a link between the value function and a novel type of Hamilton-Jacobi-Bellman (HJB) equation.
1 July 2022 in Production and Operations Management
A renewable energy site can expand its power generation capacity by an endogenous amount but may also want to shut down to save on fixed operating costs and interest payments if the market prospects deteriorate. We model such circumstances and derive managerial implications that help us explain real‐world conundrums, illustrating the intricate interactions between the operational decision to build up capacity and the financial decision to exit an industry. Shutting down may be delayed in the hope of expanding capacity upon recovery; an expansion may also be delayed in the presence of a valuable exit option. Numerical extensions provide further managerial insights. In particular, the presence of fixed or proportional financing costs may lead the firm to delay its expansion decision, but the scale of investment will only be affected by proportional costs. If herding behavior causes equipment prices to increase (respectively, decrease) when electricity prices are high (respectively, low), managers should invest earlier (respectively, later) and more (respectively, less) while equipment prices are low (respectively, high). Furthermore, although volume swings (due to capacity decommissionings and expansions) are marked in a homogeneous industry (when the default and expansion thresholds are reached), heterogeneity in the population of wind farms smooths out such effects.
30 October 2024 in Journal of Economic Dynamics and Control