5 June 2022 in European Journal of Operational Research
1 November 2018 in International Journal of Management Science and Engineering Management
Human resource policy is one of the key factors in managing a project. The cost associated with the individuals assigned to a project and the quality of the tasks completed by the assigned individuals are two of the main concerns in developing a project team. In this study, we present a new multi-objective mathematical model for developing a project team for multi-disciplinary projects under uncertainty. The objective functions optimize cost and competency simultaneously. To cope with the uncertainty and the multiple objectives in the presented model, we applied the two-stage stochastic programming approach and the Augmented Epsilon Constraint Method, respectively. The presented model and its solution methodology can be applied to different types of projects. In this study, a project that involves an overhaul of a set of aircrafts is presented as a case study.
9 April 2019 in Computers & Industrial Engineering
21 November 2017 in International Journal of Production Research
In real-world problems, machines cannot continuously operate and have to stop for maintenance before they fail. Lack of maintenance can also affect the performance of machines in processing jobs. In this paper, a permutation flow shop scheduling problem with multiple age-based maintenance requirements is modelled as a novel mixed-integer linear program in which the objectives are conflicting. In modelling the problem, we assume that infrequent maintenance can prolong job processing times. One of the objectives is to minimise the total maintenance cost by planning as few maintenance activities as possible to only meet the minimum requirements, and the other objective tries to minimise the total tardiness by sequencing the jobs and planning the maintenance activities in such a way that the processing times are not prolonged and unnecessary maintenance times are avoided. Because of this conflict, an interactive fuzzy, bi-objective model is introduced. Application of the model is illustrated through a case study for operations and maintenance scheduling of heavy construction machinery. An effective and efficient solution methodology is developed based on the structure of the problem and tested against commercial solvers and a standard GA. Computational results have verified the efficiency of the proposed solution methodology and show that unlike the proposed method, a generic metaheuristic that does not consider the unique structure of the problem can become ineffective for real-world problem sizes.
14 June 2024 in IEEE Transactions on Intelligent Transportation Systems
The Traveling Salesman Problem (TSP) is a well-known combinatorial optimization problem that has attracted extensive research efforts in developing exact methods and heuristics. However, the scalability and generalization of learning-based approaches remain significant challenges. This paper addresses this gap by proposing an approach that integrates supervised learning with traditional approaches. In particular, we introduce the concept of “anchors”, which represents nodes that should be connected to their nearest neighbors in the optimal solution. Our approach differs from the previous supervised learning approaches in that, instead of using the whole distance matrix, our neural network leverages local information to make predictions, which enables it to handle arbitrarily large-scale TSP instances without a decline on prediction accuracy. Experimental results demonstrate that our model successfully identifies 87% of the anchors with a precision of over 95% for both generated instances and TSPLIB instances, which were unseen by the model during the training. The performance of the proposed framework is evaluated by integrating the predicted anchors into existing methods such as the Miller-Tucker-Zemlin (MTZ) model and the insertion algorithms. Our approach demonstrates remarkable improvements in solution quality and computational time. By comparing with the graph pointer network, a state-of-the-art learning-based approach, the proposed algorithm achieves a 28% reduction in the average gap and a 59% decrease in computational time for solving TSP instances with 1,000 nodes.
1 June 2019 in Flexible Services and Manufacturing Journal
MDMohammad Dehghanimohammadabadi
Mohammad Dehghanimohammadabadi