Ruslan Tormosov

Ruslan Tormosov

Auto-generated profile, based on publicly available information

Ruslan Tormosov

Київський національний університет будівництва і архітектури, м. Київ

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 February 2022 in Eastern-European Journal of Enterprise Technologies
Verified
Journal Article
Open access
PDF file
ICIurii Chupryna
Iurii Chupryna
GRGalyna M. Ryzhakova
Galyna M. Ryzhakova
KCKhrystyna Chupryna
Khrystyna Chupryna
ABAndrii Biloshchytskyi
Andrii Biloshchytskyi
RTRuslan Tormosov
Ruslan Tormosov
VGViktoriya Gonchar
Viktoriya Gonchar
The innovative content of the components, stages, and results of the construction and implementation of the toolset, which provides a formalized assessment and choice of a rational scenario for reengineering implementation at a modern enterprise in the form of a target project, was displayed. The need for research is caused by the fact that the existing approaches to reengineering business processes in an application for construction enterprises require significant adjustments. The reengineering of a construction enterprise as a target project should be coordinated with the projects and works executed by a construction enterprise. The proposed analytical support makes it possible to determine for each of the construction enterprises an alternative to reengineering adapted for its needs. Modules as part of the proposed analytical support implement a single algorithm of unambiguously formalized substantiation of the construction enterprise renovation project – through a developer reengineering project. This toolset allows rationalizing and adjusting decisions on the coordination of determinative characteristics of the above project – the essence of changes, their duration, estimated cost, investment stages. The presented study provides a clearly formalized management technology for evaluating and selecting reengineering options, determining in advance the future benefits of reengineering transformations, namely, functional-technological, technological, technical, managerial, and economic changes. The created analytical support makes it possible to perform successful administrative support of a reengineering project. Its implementation will ensure an irreversible qualitative "jump" in the trajectory of the life cycle of an enterprise and expected strategic priorities.

30 October 2021 in Scientific Journal of Astana IT University
Verified
Journal Article
Closed access
ICI. Chupryna
I. Chupryna
RTR. Tormosov
R. Tormosov
KCK. Chupryna
K. Chupryna
MOM. Oleksandr
M. Oleksandr
PNP. Natali
P. Natali
European countries are recognized leaders in the use of public-private partnerships in project management for large-scale infrastructure projects, including those that contribute to energy efficiency in various sectors of the economy. Their experience is a useful example for Ukraine in its quest for energy independence and economic stability. Establishing partnerships with business will increase the resources of the state and promote the involvement of the private sector in the implementation of profitable and image projects for both stakeholders. The development of mechanisms and recommendations for the development of public-private partnership (PPP) should be preceded by an analysis of international experience in creating a favorable and attractive environment in which public-private partnerships can be intensified. Since energy efficiency is the key to the successful functioning of the economy of any state, it is necessary, creating the conditions for the successful functioning of public-private partnership, to develop programs and projects to improve energy efficiency, which will be implemented under the PPP on a priority basis.

4 May 2023
Verified
Conference Paper
Closed access
ICIurii Chupryna
Iurii Chupryna
RTRuslan Tormosov
Ruslan Tormosov
AAAbay Aryn
Abay Aryn
MHMaksym Horbach
Maksym Horbach
DPDmytro Prykhodko
Dmytro Prykhodko
MPMiroslav Polzikov
Miroslav Polzikov
The article reflects the content and innovations of the PRAIP software complex, designed for the evaluation and ranking of investment projects. Relying on trend modeling methods, the PRAIP complex provides a step-by-step arrangement of institutionally, territorially, and financially disparate projects into target programs of sustainable energy development. Special program modules as part of the PRAIP complex make it possible to reliably identify social and financial efficiency from the implementation of energy-efficient measures - both as a whole according to the target program and within its components (projects).

24 November 2023 in WAYS TO IMPROVE CONSTRUCTION EFFICIENCY
Verified
Journal Article
Open access
PDF file
ICIu. Chupryna
Iu. Chupryna
RTR. Tormosov
R. Tormosov
KPK. Predun
K. Predun
This article addresses the development of an effective mechanism for eco-economic integration of sectoral projects into a diversified investment program. The focus is placed on the necessity of combining environmental responsibility with economic feasibility in forming an investment portfolio under conditions of dynamic changes in resource availability, regulatory frameworks, and global sustainable development challenges. In the context of decentralization, digitalization of governance, and the energy transition, the role of environmentally oriented approaches to structuring investment programs is growing—programs that incorporate projects from various sectors, ranging from construction to industry and energy. The study proposes a conceptual model of a mechanism that synchronizes environmental, economic, and managerial criteria using advanced analytical tools (BI, ESG monitoring, LCA analysis). This enables not only the evaluation of each project’s potential but also the construction of integrated programs that account for the interaction between portfolio components. The paper outlines four stages of implementing such a mechanism: diagnostics of sectoral projects, integration of environmental KPIs into the investment evaluation system, multi-criteria selection considering risk factors, and program balance management through digital control panels. A matrix structure is proposed for analyzing the synergy between the environmental impacts of projects and their economic performance, which helps to avoid goal conflicts and improve the overall efficiency of the investment program. The fundamental principles for constructing the mechanism are identified: scientific validity, adaptability, transparency, multi-sectoral applicability, and digital validation. The novelty lies in combining ecological and financial modeling within a unified decision-making platform. The results of the research may be applied by public administration bodies, institutional investors, international donors, and corporations implementing sustainability strategies within portfolio-based planning frameworks.

26 February 2026 in Central Asian Economic Review
Verified
Journal Article
Open access
PDF file
AKAyagoz Khamzina
Ayagoz Khamzina
MMM. Mukan
M. Mukan
RTR. Yu. Tormosov
R. Yu. Tormosov
Purpose. This paper examines how renewable energy (RE) auction projects can be delivered effectively in Central Asia, with a focus on Kazakhstan, by aligning project delivery practices and procurement rules with local institutional conditions. Methodology. The study applies a thematic synthesis of peer-reviewed literature and selected industry reports on RE auctions and project delivery. Qualitative coding groups reported drivers and barriers into domains (tender design, risk allocation, grid and regulatory constraints, financial guarantees, EPC/O&M capabilities). A comparative matrix for Germany, Chile and India is then used to derive implications for emerging auction regimes in Central Asia. Originality/value. This review links auction design to project delivery by showing how institutional conditions shape whether auction portfolios are implemented, shifting attention from bid prices to implementation risk and system integration. Findings. Germany, Chile and India share objectives of mobilising investment, lowering prices and ensuring delivery, but they rely on different combinations of prequalification, contract models and risk-allocation mechanisms. Across cases, implementation performance depends on: (1) tender design with proportionate requirements and enforceable sanctions; (2) enabling institutional conditions (predictable policy, credible offtakers, and timely grid expansion); and (3) investor-side delivery capability, including EPC and O&M readiness. For Kazakhstan and Central Asia, the main bottlenecks reported in the literature are regulatory volatility, grid and permitting constraints, and limited local EPC/O&M capacity. The paper proposes recommendations on aligning regulatory and project cycles, coordinating grid planning with auction schedules, and calibrating prequalification and guarantees to local risks.

30 November 2020 in Management of Development of Complex Systems
Verified
Journal Article
Open access
PDF file
RTRuslan Tormosov
Ruslan Tormosov
Public-private partnership (PPP) long ago became a worldwide mechanism for the implementation of big-scale state projects, which require significant financing. One of the most widespread areas of PPP application are the sustainable energy development programs, which when successfully carried out become a key to the energy security for any country. The implementation of similar projects at the national level require the detailed examination and systematization of the international experience, which may be used to elaborate the methodical and practical recommendations for its application in the Ukrainian context. This article analyzes the Asian countries’ experience and introduces the efficiency assessment mechanism for PPP project management by the public sector, based on the analysis made. European countries are well-known leaders in application of public-private partnership for big-scale projects implementation in various economic sectors. Their experience is a good example for Ukraine on its way to energy independence and economic stability. The establishment of partner liaisons with businesses will expand the State’s capacities and facilitate the private sector engagement to profitable and image-building projects for both stakeholders. Prior to elaboration of mechanisms and recommendation for PPP development, an analysis should be carried out to study the international experience of favorable basis establishment to incentivize PPP. The ontological approaches to classification of the national targeted programs were updated to reflect the essence of the targeted sustainable energy development programs. The study of the relevant international experience and domestic practices of clusterization and public-private partnerships has confirmed that for the energy-cluster-based PPPs to be successful the political will of the national government shall be supported by businesses, civil society organizations, research centers and think-tanks, and administrative centers providing assistance to authorities and territorial communities in preparation and implementation of the targeted programs.