Pradeepkumar Ashok

Pradeepkumar Ashok

Auto-generated profile, based on publicly available information

Pradeepkumar Ashok

The University of Texas at Austin

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 September 2022 in Energies
Verified
Journal Article
Open access
PDF file
GSGurtej Singh Saini
Gurtej Singh Saini
AFAmirHossein Fallah
AmirHossein Fallah
PAPradeepkumar Ashok
Pradeepkumar Ashok
EOEric Van Oort
Eric Van Oort
Well construction is a complex multi-step process that requires decision-making at every step. These decisions, currently made by humans, are inadvertently influenced by past experiences and human factor issues, such as the situational awareness of the decision-maker. This human bias often results in operational inefficiencies or safety and environmental issues. While there are approaches and tools to monitor well construction operations, there are none that evaluate potential action sequences and scenarios and select the best possible sequence of actions. This paper defines a generalized iterative methodology for setting up a digital twin to address this shortcoming. Depending on its application, the objectives and constraints around the twin are formulated. The digital twin is then built using a cyclical process of defining the required outputs, identifying and integrating the necessary process models, and aggregating the required data streams. The twin is set up such that it is predictive in nature, thus enabling scenario analysis. The method is demonstrated here by setting up twinning systems for two different categories of problems. First, an integrated multi-model twin to replicate borehole cleaning operations for stuck-pipe prevention is developed and tested. Second, the creation, implementation, and testing of a twinning system for assisting with operational planning and logistics is demonstrated by considering the time it takes to drill a well to total depth (TD). These twins are also used to simulate multiple future scenarios to quantify the effects of different actions on eventual outcomes. Such systems can help improve operational performance by allowing more informed human, as well as automated, decision-making. Development of a system for well construction operations that integrates multiple sources of information with process and equipment models to quantify the system state and analyzes different scenarios by evaluating action sequences is a novel contribution of this paper. The approach presented here can be applied to the construction of digital twins for any well construction operation.

13 March 2023 in SPE Drilling & Completion
Verified
Journal Article
Closed access
PDF file
MKMohamed Shafik Khaled
Mohamed Shafik Khaled
NWNingyu Wang
Ningyu Wang
PAPradeepkumar Ashok
Pradeepkumar Ashok
DCDongmei Chen
Dongmei Chen
EOEric Van Oort
Eric Van Oort
Summary: High bottomhole temperature can lead to decreased downhole tool life in geothermal and high-pressure/high-temperature (HPHT) oil and gas wells. The temperature increase is exacerbated when circulation stops (e.g., during connection, tripping, and well control situations). While continuous circulation technology is an appropriate solution for managing temperature, it is not yet widely adopted in HPHT and geothermal drilling practices. This work investigates factors that impact downhole temperature (DHT) and recommends strategies to better manage the temperature when continuous circulation is not available. An integrated thermo-hydraulic model was developed to capture the transient behavior of DHT and was applied here to study the transient temperature profile when there is no fluid circulation. The model was validated using the open-source FORGE field data set, with the mean absolute percentage error between 1% and 4%. In addition, hundreds of case scenarios were numerically studied to investigate the impact of several key factors on the DHT. The evaluated factors include the pumps-off time, type and physical properties of the drilling fluid, wellbore hydraulic diameter, reservoir temperature, geothermal gradient, total wellbore depth and profile, and operational parameters before stopping the circulation. The cooling effects of different drilling parameters were compared to a benchmark case of continuous circulation. A correlation map was generated to visualize the impact of those parameters on the DHT distribution when circulation stops. A logarithmic relationship between the pump stop time and the DHT was observed. For the FORGE case scenario, the DHT increases by 27°C and 48°C after the pump stops for 30 minutes and 60 minutes, respectively. It was observed that water-based mud (WBM) with a high viscosity increases fluid convection heat resistance between the formation and wellbore. Also, drilling with a higher flow rate before stopping the pump can cool the near-wellbore formation faster and reduce the DHT even after circulation ceases. Wells with high geothermal gradients, like FORGE wells, have a higher temperature buildup during circulation stoppage than wells with low geothermal gradients targeting the same reservoir (formation) in-situ temperature. This study investigates the efficacy of different cooling strategies to avoid DHT buildup when there is no circulation. It thereby facilitates the optimization of geothermal and HPHT well design and construction to prevent downhole tool failures. The developed correlation map can aid drilling engineers in understanding the impact of different drilling conditions on the DHT.

9 February 2023 in SPE Journal
Verified
Journal Article
Closed access
PDF file
MKMohamed Shafik Khaled
Mohamed Shafik Khaled
DCDongmei Chen
Dongmei Chen
PAPradeepkumar Ashok
Pradeepkumar Ashok
EOEric Van Oort
Eric Van Oort
Summary: Geothermal energy has gained much attention as a promising contributor to the energy transition for its ability to provide a reliable, environmentally friendly source of heat and baseload power. However, drilling high-temperature (HT) reservoirs presents significant technical and economic challenges, including thermally induced damage to bits and downhole (DH) tools, increasing drilling time and cost. This paper introduces drilling heat maps for proactive temperature management in geothermal wells during well planning and real-time drilling operations phases to avoid thermally induced drilling problems. This study uses a transient hydraulic model integrated with a thermal model to predict the bottomhole circulating temperature (BHCT) while drilling geothermal wells. The model is used to generate a large volume (1,000s) of case scenarios to explore the impact of various cooling and other heat management strategies on the BHCT in the Utah FORGE field, used here as an example, covering a wide range of drilling parameters. Results are captured, visualized, and analyzed in convenient heat maps, illustrating the advantages of using such heat maps in geothermal well construction and real-time operations. Model validation with FORGE 16A(78)-32 well data and a west Texas case scenario shows good agreement between the modeling results and experimental data, with a mean absolute percentage error (MAPE) of less than 4%. There is a clear logarithmic relationship between the drilling flow rate and BHCT at a constant mud inlet temperature and a linear relationship between the mud inlet temperature and BHCT at a constant drilling flow rate. Pronounced variation of BHCT in geothermal wells is observed with mud type, mud weight, and mud viscosity. In addition, insulated drillpipe (IDP) technology is found to significantly reduce BHCT (14–44% on average for FORGE scenarios) compared to conventional drillpipe (CDP), particularly in wells with extended measured depth (MD) where other heat management technologies and strategies become less effective. Drilling heat maps can alert drilling engineers to strategies with the highest BHCT-lowering impact, allowing focused technology selection and decision-making regarding optimal temperature management during the geothermal well design phase. In addition, real-time heat maps are valuable for facilitating active temperature management and providing real-time guidance for optimal drilling parameters during daily drilling operations. In general, heat maps can help to avoid drilling problems related to the combination of HT and temperature limitations of DH equipment, which will benefit the safe and cost-efficient development of geothermal resources.

27 March 2025 in SPE Journal
Verified
Journal Article
Closed access
AMAbraham C. Montes
Abraham C. Montes
PAPradeepkumar Ashok
Pradeepkumar Ashok
EOEric Van Oort
Eric Van Oort
Summary: Stuck pipe events continue to be a major cause of nonproductive time (NPT) in well construction operations. Considerable efforts have been made in the past to construct prediction models and early warning systems to prevent stuck pipe incidents. This trend has intensified in recent years with the increased accessibility of artificial intelligence (AI) tools. This paper presents a comprehensive review of existing models and early-warning systems and proposes guidelines for future improvements. In this paper, we review existing prediction approaches on their merits and shortcomings, investigating five key aspects of the approaches: (1) the time-frequency and spatial bias of the data with which the models are constructed, (2) the variable space, (3) the modeling approach, (4) the assessment of the model’s performance, and (5) the model’s facility to provide intuitive and interpretable outputs. The analysis of these aspects is combined with advancements in anomaly detection across other relevant domains to construct guidelines for the improvement of real-time stuck pipe prediction. Existing solutions for stuck pipe prediction face numerous challenges, allowing this problem to remain unsolved in the broad scope of progressing drilling automation. In our analysis, we looked at notable approaches, including decentralized sticking prediction, sophisticated data-driven models coupled with explanation tools, and data-driven models coupled with physics-based simulations (hybrid sticking predictors). However, even these sophisticated approaches face challenges associated with general, nonspecific applicability, robustness, and interpretability. While the best approaches tackle some of these challenges, they often fail to address all of them simultaneously. Furthermore, we found that there is no standardized method for assessing model performance or for conducting comparative studies. This lack of standardization leads to an unclear ranking of (the merits and shortcomings of) existing prediction models. Finally, we encountered cases where unavailable information (i.e., information that would not be available when the model is deployed in the field for actual stuck pipe prediction) was used in the models’ construction phase (referred to here as “data leakage”). These findings, along with good practices in anomaly detection, are compiled in the form of guidelines for the construction of improved stuck pipe prediction models. This paper is the first to comprehensively analyze existing methods for stuck pipe prediction and provide guidelines for future improvements to arrive at more universally applicable, real-time, robust, and interpretable stuck pipe prediction. The application of these guidelines is not limited to stuck pipe prediction and can be used for predictive modeling of other types of drilling abnormalities, such as lost circulation, drilling dysfunctions, and so on. Additionally, these guidelines can be leveraged in any drilling and well construction application, whether it is for oil and gas recovery, geothermal energy, or carbon storage.

9 August 2022 in Energies
Verified
Journal Article
Open access
PDF file
GSGurtej Singh Saini
Gurtej Singh Saini
OEOney Erge
Oney Erge
PAPradeepkumar Ashok
Pradeepkumar Ashok
EOEric Van Oort
Eric Van Oort
Well construction operations require continuous complex decision-making and multi-step action planning. Action selection at every step demands a careful evaluation of the vast action space, while guided by long-term objectives and desired outcomes. Current human-centric decision-making introduces a degree of bias, which can result in reactive rather than proactive decisions. This can lead from minor operational inefficiencies all the way to catastrophic health and safety issues. This paper details the steps in structuring unbiased purpose-built sequential decision-making systems. Setting up such systems entails representing the operation as a Markov decision process (MDP). This requires explicitly defining states and action values, defining goal states, building a digital twin to model the process, and appropriately shaping reward functions to measure feedback. The digital twin, in conjunction with the reward function, is utilized for simulating and quantifying the different action sequences. A finite-horizon sequential decision-making system, with discrete state and action space, was set up to advise on hole cleaning during well construction. The state was quantified by the cuttings bed height and the equivalent circulation density values, and the action set was defined using a combination of controllable drilling parameters (including mud density and rheology, drillstring rotation speed, etc.). A non-sparse normalized reward structure was formulated as a function of the state and action values. Hydraulics, cuttings transport, and rig state detection models were integrated to build the hole cleaning digital twin. This system was then used for performance tracking and scenario simulations (with each scenario defined as a finite-horizon action sequence) on real-world oil wells. The different scenarios were compared by monitoring state–action transitions and the evolution of the reward with actions. This paper presents a novel method for setting up well construction operations as long-term finite-horizon sequential decision-making systems, and defines a way to quantify and compare different scenarios. The proper construction of such systems is a crucial step towards automating intelligent decision-making.

5 September 2018
Verified
Conference Paper
Closed access
PDF file
MSMojtaba Shahri
Mojtaba Shahri
BKBahri Kutlu
Bahri Kutlu
TTTaylor Thetford
Taylor Thetford
BNBrian Nelson
Brian Nelson
TWTimothy Wilson
Timothy Wilson
PAPradeepkumar Ashok
Pradeepkumar Ashok
The first step towards drilling optimization and automation is a reliable data acquisition and handling system. This includes receiving and processing different frequency data across multiple platforms and ensuring proper data quality. Once we implement such a platform, we can build different advisory solutions to improve drilling efficiency and move towards drilling automation. The developed Drilling Intelligence Guide (DIG) already enabled us to achieve the aforementioned goal and access different data (from contextual to high frequency) in real-time. In the next phase, different models (physical or data analytics) can be built in to optimize various stages of drilling operations. The drilling industry has made significant progress on different physical models that can be run offline (either for pre-job design or post-job analysis) in the previous decades. Given the developed data platform, we can now adopt and run these models in real-time for optimization and automation purposes. As an example, a real-time, computationally efficient hydraulic model that can account for drill string rotation and eccentricity would enable us to monitor ECD (to be used for wellbore stability, kick and lost circulation mitigation) and calculate pump pressure corresponding to different operational conditions (to be used for drill string washout/pump failure prediction and sensor calibration). The aim of this paper is to show the application of the hydraulic model for real-time monitoring and optimization purposes. An analytical hydraulic model including drill pipe rotation and eccentricity effects is used and compared against transient numerical simulations. In the next step, Pressure While Drilling (PWD) data are used to verify the accuracy of the model for real-time applications. After the verification steps, we explain the process to couple real-time data (e.g., flow rate, RPM), contextual data (e.g., mud properties, BHA and wellbore geometry) and the physical model using field examples. In addition to ECD monitoring at the bit and casing shoe, the real-time hydraulic model can also be used to monitor washout and pump failure events. The application of the model is shown using field examples.