O. V. Starostina

O. V. Starostina

Auto-generated profile, based on publicly available information

O. V. Starostina

Abylkas Saginov Karaganda Technical University

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 October 2026 in Горный журнал Казахстана
Verified
Journal Article
Closed access
DOD.S. Ozhigin
D.S. Ozhigin
AKA.U. Kubaidullina
A.U. Kubaidullina
VKV.V. Kazantseva
V.V. Kazantseva
OSO.V. Starostina
O.V. Starostina
This paper investigates the potential of multi-temporal satellite radar interferometry for monitoring the deformation state of the Sherubay-Nura Reservoir dam. Spatial and temporal displacements of the structure were assessed using the SBAS-InSAR approach based on Sentinel-1 satellite imagery. Trihedral corner refl ectors were employed to improve the reliability of interferometric measurements by ensuring stable identifi cation of reference points. The analysis enabled the identifi cation of localized deformation zones and the assessment of displacement rates and their temporal evolution, demonstrating the eff ectiveness of integrating InSAR technology with corner refl ectors for the remote monitoring of hydraulic structures Мақалада Шерубай-Нұра су қоймасы бөгетінің деформациялық жағдайын мониторингілеуде көпуақытты спутниктік радиолокациялық интерферометрия технологиясының мүмкіндіктері қарастырылған. Sentinel-1 спутниктік түсірілімдері негізінде SBAS-InSAR әдісін қолдану арқылы құрылыстың кеңістіктік-уақыттық ығысуларына бағалау жүргізілді. Интерферометриялық өлшеулердің сенімділігін арттыру мақсатында бақылау нүктелерін тұрақты сәйкестендіруді қамтамасыз ететін үшқырлы бұрыштық шағылдырғыштар пайдаланылды. Жүргізілген талдау деформациялардың жергілікті аймақтарын анықтауға, ығысу жылдамдықтары мен олардың даму сипатын бағалауға мүмкіндік берді және гидротехникалық құрылыстардың деформациялық жағдайын қашықтан мониторингілеуде InSAR технологиясы мен бұрыштық шағылдырғыштарды бірлесіп қолданудың тиімділігін растады В статье рассмотрены возможности многовременной спутниковой радиолокационной интерферометрии для мониторинга деформационного состояния дамбы Шерубай-Нуринского водохранилища. На основе метода SBAS-InSAR по данным спутниковой съемки Sentinel-1 выполнена оценка пространственно-временных смещений сооружения. Для повышения надежности интерферометрических измерений использованы трехгранные уголковые отражатели, обеспечившие устойчивую идентификацию контрольных точек. Выполненный анализ позволил выявить локальные зоны деформаций, оценить скорости и характер развития смещений, подтвердив эффективность совместного применения технологии InSAR и уголковых отражателей для дистанционного мониторинга гидротехнических сооружений

1 January 2025 in Mine Surveying and Subsurface Use
Verified
Journal Article
Closed access
A(A. Saginov Karaganda Technical University (KarTU)
A. Saginov Karaganda Technical University (KarTU)
VDV. F. Demin
V. F. Demin
SAS. B. Aliev
S. B. Aliev
ISInstitute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
Institute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
NMN. А. Milеtenko
N. А. Milеtenko
VDV. N. Dolgonosov
V. N. Dolgonosov
The article contains the results of research on the development of technology and means of fastening mine workings, taking into account the stress-strain state of the coal rock massif based on digital modeling. Design documentation of rockbolt support has been developed. Bench tests of a batch of pilot-industrial samples in laboratory conditions and pilot-industrial tests of rope and composite rockbolt in mine conditions. Recommendations have been developed on the effective use of the technology of rockbolt support of preparatory workings when conducting tectonic disturbances, increased rock pressure, the influence of cleaning operations, at the junctions and in the lavas of mining sections of mines.

1 January 2024 in Mine Surveying and Subsurface Use
Verified
Journal Article
Closed access
ISInstitute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
Institute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
SAS. B. Aliev
S. B. Aliev
GPG. А. Pak
G. А. Pak
A(A. Saginov Karaganda Technical University (KarTU)
A. Saginov Karaganda Technical University (KarTU)
VSV. N. Shennikov
V. N. Shennikov
VDV. N. Dolgonosov
V. N. Dolgonosov
The article panel 28 D1-2 «Shakhtinskaya» coal mine geomechanical analyses. Currently, the installation of equipment has been completed and the breakage face will be launched in September 2024 year. The results of structural modeling of the site were considered. As a result of the analysis, a number of unfavorable factors were identified. The expected working conditions of the facility are characterized as difficult.

1 January 2024 in Mine Surveying and Subsurface Use
Verified
Journal Article
Closed access
AUAbylkas Saginov Karaganda Technical University
Abylkas Saginov Karaganda Technical University
VKV. V. Kazantseva
V. V. Kazantseva
UKU. A. Kubaydullina
U. A. Kubaydullina
RBR. K. Baigali
R. K. Baigali
VYVera Yartseva
Vera Yartseva
OSO. V. Starostina
O. V. Starostina
The article is dedicated to the use of air photography for adjacent rock mass monitoring with DJI Mavic 2 Pro drone at Ekolog Open-pit Mine. The survey objective is to create high-precision geospatial models of the terrain to analyze site conditions. Particular attention is paid to flight mission planning with due regard for the terrain to improve the accuracy of the data required for further mine surveying.