Eshagh Namazi

Eshagh Namazi

Auto-generated profile, based on publicly available information

Eshagh Namazi

COWI, London, UK

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 February 2020 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
HSH. Sohaei
H. Sohaei
ENE. Namazi
E. Namazi
MHMohsen Hajihassani
Mohsen Hajihassani
AMA. Marto
A. Marto

16 January 2022 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
ENE. Namazi
E. Namazi
MHMohsen Hajihassani
Mohsen Hajihassani
SGS. O. Gilani
S. O. Gilani
SZSayyed Yaghoub Zolfegharifar
Sayyed Yaghoub Zolfegharifar

1 July 2018 in International Journal of Physical Modelling in Geotechnics
Verified
Journal Article
Closed access
HSHouman Sohaei
Houman Sohaei
ENEshagh Namazi
Eshagh Namazi
AMAminaton Marto
Aminaton Marto
The effect of installing micropiles between the existing piles and the tunnel is not well understood. This paper discusses the effectiveness of micropiles as a means to control tunnelling-induced ground movement and movements of an existing pile, located at a distance of one times the tunnel diameter from the tunnel axis. Laboratory physical model tests had been conducted in dry sand of 50% relative density using a row of 3·7 mm dia. micropiles with two different lengths (110 and 145 mm), embedded in between the tunnel (overburden ratio of 3) and the existing pile at four different locations. During the tests, settlement, the bending moment and axial force of the existing pile have been monitored. The results show that the micropiles reduced by more than 85 and 75% of the piles’ lateral and axial movements, respectively. Within the limitation of the study, it has been concluded that the most suitable length and location of the micropiles are 145 mm (tip of the micropiles is closest to the tunnel crown), located exactly in the middle between the tunnel axis and the pile. It is based on the reduction observed on the vertical and lateral movements of the pile as well as in the bending moment, and the axial force.