Rosa Medina Durán

Rosa Medina Durán

Auto-generated profile, based on publicly available information

Rosa Medina Durán

Departamento de Ingeniería Industrial, Universidad de Concepción, Chile

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2012 in European Journal of Operational Research
Verified
Journal Article
Closed access
FFFabio Furini
Fabio Furini
EMEnrico Malaguti
Enrico Malaguti
RDRosa Medina Durán
Rosa Medina Durán
APAlfredo Persiani
Alfredo Persiani
PTPaolo Toth
Paolo Toth

1 September 2014 in Omega
Verified
Journal Article
Closed access
EMEnrico Malaguti
Enrico Malaguti
RDRosa Medina Durán
Rosa Medina Durán
PTPaolo Toth
Paolo Toth

1 October 2015
Verified
Conference Paper
Closed access
MNMargaux Nattaf
Margaux Nattaf
CAChristian Artigues
Christian Artigues
PLPierre Lopez
Pierre Lopez
RMRosa Medina
Rosa Medina
VPVictor Parada
Victor Parada
LPLorena Pradenas
Lorena Pradenas
This paper considers a production scheduling problem in a Chilean company from the metalworking industry. This company produces steel balls of different diameters on parallel production lines. There are different types of production lines and each production line may have a different speed for producing each diameter. Furthermore a setup time occurs when changing the diameter produced on each machine. Besides these production and setup operations, maintenance operations have to be scheduled. These electrical machines yield high energy demands. It is therefore crucial to minimize total energy consumption, which depends on batch/machine assignment, and maximum demand on peak hours. We consider the batch sizing and scheduling problem involving electricity costs in a non-uniform parallel machine context. Given a demand for each family of steel balls, the problem consists in splitting the demand in sublots (batches) that have to be assigned and scheduled on the parallel machines together with the required maintenance operations. The goal is to complete the schedule before a common deadline while minimizing electricity costs. We propose to tackle this problem through mixed integer linear programming. We propose a global formulation and a two-phase matheuristic. Computational results on realistic instances are provided.

1 September 2019 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
EMEnrico Malaguti
Enrico Malaguti
RDRosa Medina Durán
Rosa Medina Durán

25 June 2015 in Optimization Letters
Verified
Journal Article
Closed access
PDF file
EMEnrico Malaguti
Enrico Malaguti
RDRosa Medina Durán
Rosa Medina Durán
PTPaolo Toth
Paolo Toth

1 October 2017
Verified
Conference Paper
Closed access
RDRosa Medina Duran
Rosa Medina Duran
EMEnrico Malaguti
Enrico Malaguti
CDCristian Duran-Faundez
Cristian Duran-Faundez
This paper tackles the problem of finding the list of solutions with strictly increasing cost for the Semi-Assignment Problem. Four different algorithms are described and compared. The first two algorithms are based on a mathematical model and on a modification of Murty's algorithm, which was designed to find the list of solutions for the classical assignment problem. The third approach is a heuristic that quickly finds a list of solutions, but is not guaranteed to find the best possible ones. As the fourth approach, we present a new algorithm based in Murty's approach, adding symmetry cuts in order to avoid the generation of assignments with the same cost, previously found in the searching tree. The results show that our proposal finds the exact list of solutions, and considerably reduces the computation times in comparison with the other exact approaches.