Xing Rao

Xing Rao

Auto-generated profile, based on publicly available information

Xing Rao

School of Mechanical and Electrical Engineering, Central South University, Changsha, Hunan 410083, China

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 February 2019 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
HPHeng Pan
Heng Pan
DADiego Arbelaez
Diego Arbelaez
HFHelene Felice
Helene Felice
AHAurelio. R. Hafalia
Aurelio. R. Hafalia
TLThomas Lipton
Thomas Lipton
XRXing Rao
Xing Rao
The superconducting electron cyclotron resonance (ECR) source magnet for the facility for rare isotope beams at Michigan State University was designed and built by the Superconducting Magnet Group at Lawrence Berkeley National Laboratory (LBNL) in 2017. The 28 GHz NbTi ion source magnet features a sextupole-in-solenoids configuration which is comparable to the VENUS ECR magnet operated at LBNL. However, the mechanical design of this magnet utilizes a shell-based support structure which allows fine adjustments to the sextupole preload and reversibility of the magnet assembly process. The magnet has been assembled and tested to operational currents at LBNL. This paper describes the mechanical analyses performed to estimate the sextupole's and solenoids' preloads. We will report on the 3-D finite element analysis during room temperature assembly, cool-down, and magnet excitation, and then describe the magnet preload operations. Finally, we will describe the performance of the support structure during the quench training.

1 August 2021 in Applied Ocean Research
Verified
Journal Article
Closed access
WCWei Chen
Wei Chen
HXHai-Liang Xu
Hai-Liang Xu
FYFang-Qiong Yang
Fang-Qiong Yang
XRXing Rao
Xing Rao
YZYong-Xing Zhou
Yong-Xing Zhou
PLPENG LIN
PENG LIN

1 February 2016 in Review of Scientific Instruments
Verified
Journal Article
Open access
GMGuillaume Machicoane
Guillaume Machicoane
HFHelene Felice
Helene Felice
JFJesse Fogleman
Jesse Fogleman
RHRay Hafalia
Ray Hafalia
GMGlenn Morgan
Glenn Morgan
LTLarry Tobos
Larry Tobos
Ahead of the commissioning schedule, installation of the first Electron Cyclotron Resonance (ECR) ion source in the front end area of the Facility for Rare Isotope Beam (FRIB) is planned for the end of 2015. Operating at 14 GHz, this first ECR will be used for the commissioning and initial operation of the facility. In parallel, a superconducting magnet structure compatible with operation at 28 GHz for a new ECR ion source is in development at Lawrence Berkeley National Laboratory. The paper reviews the overall work in progress and development done with ECR ion sources for FRIB.

16 July 2026 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Verified
Journal Article
Closed access
AGA. Gonzalez
A. Gonzalez
APA.S. Plastun
A.S. Plastun
POP.N. Ostroumov
P.N. Ostroumov
XRX. Rao
X. Rao