Arash Erfani

Arash Erfani

Auto-generated profile, based on publicly available information

Arash Erfani

Department of Civil Engineering, Building Physics and Sustainable Design

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 August 2022 in Energy Reports
Verified
Journal Article
Open access
GBGerard Laguna Benet
Gerard Laguna Benet
GMGerard Mor
Gerard Mor
FLFlorencia Lazzari
Florencia Lazzari
EGEloi Gabaldon
Eloi Gabaldon
AEArash Erfani
Arash Erfani
JCJordi Cipriano
Jordi Cipriano

14 October 2023 in Building Simulation
Verified
Journal Article
Closed access
PDF file
AEArash Erfani
Arash Erfani
TJTohid Jafarinejad
Tohid Jafarinejad
SRStaf Roels
Staf Roels
DSDirk Saelens
Dirk Saelens

12 June 2024 in Energy and Buildings
Verified
Journal Article
Closed access
AEArash Erfani
Arash Erfani
TJTohid Jafarinejad
Tohid Jafarinejad
SRStaf Roels
Staf Roels
DSDirk Saelens
Dirk Saelens

24 June 2024 in Building and Environment
Verified
Journal Article
Closed access
AEArash Erfani
Arash Erfani
TJTohid Jafarinejad
Tohid Jafarinejad
SRStaf Roels
Staf Roels
DSDirk Saelens
Dirk Saelens

25 October 2025 in Energy and Buildings
Verified
Journal Article
Closed access
TJTohid Jafarinejad
Tohid Jafarinejad
AEArash Erfani
Arash Erfani
DSDirk Saelens
Dirk Saelens

1 December 2023 in Journal of Physics: Conference Series
Verified
Conference Paper
Open access
PDF file
AEArash Erfani
Arash Erfani
TJTohid Jafarinejad
Tohid Jafarinejad
SRStaf Roels
Staf Roels
DSDirk Saelens
Dirk Saelens
This study aims at assessing the impact of dataset quality on the performance of Model Predictive Control (MPC). The dataset feature, which is the target of this study, is temporal resolution, which applies to both data logging and the controller time step. A high temporal resolution might result in a more accurate predictive model, but it increases the need for data storage as well as the computational load on the model training. From the controller side, increasing the temporal resolution might lead to better control performance, but it sabotages the real-time response of the system. First, predictive models are developed based on datasets with different temporal resolutions. Subsequently, these predictive models are implemented within an MPC. Results reveal that decreasing the time step lower than 1 hour does not significantly improve the performance of the MPC. However, increasing the time step of MPC above 1 hour deteriorates its performance. Real-time response of the controller is a crucial criterion which deteriorates as the time step shortens. Hence, a suitable choice of temporal resolution is essential for developing a predictive model and MPC. In our case, a resolution of 1 hour is enough to guarantee a good performance of the controller.