Hanlin Zhang

Hanlin Zhang

Auto-generated profile, based on publicly available information

Hanlin Zhang

School of Electrical Engineering Southeast University Nanjing China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2022 in IET Renewable Power Generation
Verified
Journal Article
Open access
HZHanlin Zhang
Hanlin Zhang
SZSuyang Zhou
Suyang Zhou
WGWei Gu
Wei Gu
ZLZhong Liu
Zhong Liu
XZXin Zhan
Xin Zhan
HLHengmen Liu
Hengmen Liu
Investments in the energy networks will significantly influence the outcome of Integrated Energy System (IES) planning. It is difficult to optimally plan the energy stations and energy networks of IES while taking into consideration the energy network investments. Thus, a collaborative planning methodology is proposed for energy stations and energy networks containing multiple energy carriers, which can optimize both the capacity of the energy devices and networks and the topology of the energy networks. The linearization for the energy storage devices and electric air conditioning models, as well as the second‐order relaxation for the power grid and gas network models are implemented, and the optimization model is subsequently transformed into a mixed‐integer second‐order cone programming (MISOCP) form which can be directly solved by the commercial solvers. Numerical analysis is carried out to prove the effectiveness of the proposed model and method and the results show that energy networks with optimal topology can significantly improve the energy utilization efficiency of the system and reduce the total cost. In addition, the investment cost of the energy networks plays a decisive role in the network topology as well as the way how the energy is supplied to energy stations.

27 November 2024 in IET Renewable Power Generation
Verified
Journal Article
Open access
YQYue Qiu
Yue Qiu
YYYunting Yao
Yunting Yao
SZSuyang Zhou
Suyang Zhou
HZHanlin Zhang
Hanlin Zhang
Yu-Qing BaoYu-Qing Bao
Yu-Qing Bao
With the development of distributed energy resources and intelligent energy management technologies, park‐level integrated energy systems (PIESs) are essential for multi‐energy flow conversion and utilization. However, coordinating the upstream energy sources, internal energy stations, distribution networks, and downstream loads within the PIES framework remains a challenge. Developing a station‐network coordinated planning scheme for PIES confronts challenges, such as overly complex models that are difficult to solve and the difficulty of implementing standard methods for medium and long‐term planning. This paper proposes a multi‐stage coordinated planning approach for PIES, containing energy stations, multi‐energy networks, and load aggregation nodes. The energy equipment and energy networks are precisely modelled to enhance the reliability of the planning scheme. The chance‐constrained programming (CCP) method is adopted to address uncertainties arising from renewable energy generation. Additionally, the improved big‐M method and second‐order cone (SOC) relaxation technique are utilized to manage non‐linear elements, transforming the model into a mixed‐integer second‐order cone programming (MISOCP) form to enhance solution efficiency. A case study illustrates that the proposed method enables effective allocation of equipment and networks, outperforming single‐stage planning by reducing investment costs, enhancing facility utilization rates, and facilitating renewable energy integration.