Lei Zhu

Lei Zhu

Auto-generated profile, based on publicly available information

Lei Zhu

School of Civil Engineering, Harbin Institute of Technology, Harbin 150090, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 December 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
CFChuntao Feng
Chuntao Feng
ZCZhihe Cheng
Zhihe Cheng
LZLei Zhu
Lei Zhu
Based on the deep foundation pit for a subway station in Changchun (China), a 3D numerical model of water–heat coupling in a prestressed pile anchor system was established to determine its performance in freezing and thawing seasons in alpine areas. Its reliability was confirmed using field monitoring data on the prestressed anchor cables, which demonstrated changes in surface subsidence, anchor cable axial force, and pile horizontal displacement during spring thaw. The results demonstrated different degrees of elevation of the ground surface at the beginning of the spring thaw depending on whether the ground surface was at 2, 5, or 8 m from the pit excavation surface. Moreover, they demonstrated the occurrence of melting and surface subsidence when the temperature rises above 0°C, and that the axial force of the anchor cables fluctuates at the beginning of spring thaw but stabilizes in its middle and late stages. The phenomenon of pile horizontal displacement during the spring thaw could be roughly divided into three stages, with the second stage resulting in the most significant displacement. These results can provide certain reference for deep foundation pit projects in alpine areas.

20 May 2023 in Geofluids
Verified
Journal Article
Open access
PDF file
QSQiang Shi
Qiang Shi
DZDehui Zhao
Dehui Zhao
YWYe Wang
Ye Wang
YLYufeng Li
Yufeng Li
LZLei Zhu
Lei Zhu
ZCZhihe Cheng
Zhihe Cheng
This study investigated the supporting mechanism of the retaining piles and prestressed anchor cables of a deep foundation pit in alpine regions during the spring thaw. A numerical model was developed based on a subway project in Changchun City. Field monitoring data and the numerical model were used to analyze the variations in the ground settlement, horizontal displacement of the pile tops, and axial force of the anchor cables during the spring thaw under different working conditions. The results demonstrated that changes in the ground settlement primarily occurred in the late stages of the spring thaw with no obvious settlement phenomena because of the thaw. The pile top displacement of most piles remained stable. The axial force of the anchor cables gradually decreased and then sharply increased early in the spring thaw and then slowly decreased in the middle and late stages. Increasing the pile length decreased the pile top displacement to a certain point. Moreover, increasing the pile length increased the axial force of the first anchor cable but decreased the axial force of the lower four anchor cables. Furthermore, increasing the pile spacing increased the pile top displacement and axial force of the five anchor cables. Increasing the incident angle of the anchor cables decreased the pile top displacement and increased the axial force of the first, third, and fourth cables. The axial force of the second cable was minimized at an incident angle of 14°, and the axial force of the fifth cable was minimized at incident angles of 16° and 18°.