Xiaojing Hu

Xiaojing Hu

Auto-generated profile, based on publicly available information

Xiaojing Hu

Power System Automation Institute, China Electric Power Research Institute, Beijing 100192, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
XHXiaojing Hu
Xiaojing Hu
HMHaoling Min
Haoling Min
SDSai Dai
Sai Dai
ZCZhi Cai
Zhi Cai
XYXiaonan Yang
Xiaonan Yang
FXFeng Xiao
Feng Xiao
Renewable energy consumption is one of the most important factors in meeting the goal of “30 and 60” in China. However, the maintenance of the transmission section affects the amount of generation transfer, further affecting the consumption of renewable energy. Hence, in this study, a time-series renewable energy production simulation (REPS) is proposed in order to accurately predict the power generation in a simulated situation. According to the results of the REPS, the sensitivity of the different sections’ maintenance can be calculated and determined. The appropriate maintenance strategies can be selected for different situations by comparing the consumption rate; as an example, we conducted a case study. The results show that the quota in the transmission section has higher sensitivity; a larger quota indicates a greater sensitivity to the consumption rate. The results also show that a larger quota is more suitable for maintenance in February or November, since the consumption rate is higher regardless of if it is in a single-transmission-section maintenance strategy or in a two-section simultaneous maintenance strategy.