Priscila Ferreira de Araujo Lima

Priscila Ferreira de Araujo Lima

Auto-generated profile, based on publicly available information

Priscila Ferreira de Araujo Lima

Department of Management and Engineering, University of Padova, Stradella San Nicola 3, 36100, Vicenza, Italy

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 February 2020 in European Management Journal
Verified
Journal Article
Closed access
PLPriscila Ferreira de Araújo Lima
Priscila Ferreira de Araújo Lima
MCMaria Crema
Maria Crema
Chiara VerbanoChiara Verbano
Chiara Verbano

1 January 2019 in Journal of technology management & innovation
Verified
Journal Article
Open access
PDF file
PLPriscila Ferreira de Araujo Lima
Priscila Ferreira de Araujo Lima
Chiara VerbanoChiara Verbano
Chiara Verbano
Despite its strategical importance, the diffusion of Project Risk Management (PRM) is limited mainly to large companies, leaving a lack of empirical evidence addressing small and medium-sized enterprises (SMEs). Therefore, the objective of this paper is to analyse how to adopt PRM in SMEs with a positive cost-benefit ratio, considering risk management (RM) phases, activities, tools, instruments, procedures and organisational aspects that enable the effective implementation of PRM in SMEs. To identify the fundamental dimensions to insert in the framework, a systematic literature review was performed, and a pilot case study was conducted to test the validity of the empirical framework and improve it. Moreover, after the case analysis, the benefits obtained and the difficulties faced through the adoption of PRM are presented and discussed.