With the increasing trend of globalization, countries actively join the international engineering market, increasing the complexity of projects. An appropriate method for assessing project complexity can help project managers recognize the current situation and solve problems. However, existing complexity studies ignored the contribution of human element. The impact of human activities on the complexity of socio-economic systems is concerned in the Harmony Management Theory (HMT), therefore, this study proposed a complexity measurement based on the Harmony Management Theory. Firstly, an evaluation indicator system including three dimensions of organizational, technological, and environmental complexity is proposed through a literature review, Back-Propagation Neural Network-Decision Making Trial and Evaluation Laboratory (BP-DEMATEL) method, and Interval-valued intuitionistic Fuzzy Sets (IIFS) are used to calculate complexity scores. Then, a case study of Yawan high-speed railway project is conducted to verify the effectiveness of the proposed method. The main conclusions are as follows: (1) The complexity measurement based on harmony theory can be carried out from three aspects: Organization, technology, and environment. (2) The overall complexity performance of case project is 0.52, showing a medium level. (3) Technical complexity is the most important factor of the case project. The method proposed in this study can identify the influencing factors of complexity and calculate the comprehensive evaluation value of complexity. Based on the final quantified results, managers can formulate appropriate measures and match the project with appropriate resources so as to improve the performance of International Engineering Projects (IEPs).
23 December 2021 in International Journal of Behavioral Medicine
Background: Individuals’ physical and mental health, as well as their chances of returning to work after their ability to work is damaged, can be addressed by medical rehabilitation.Aim: This study investigated the developmental trends of mental and physical health among patients in medical rehabilitation and the roles of self-efficacy and physical fitness in the development of mental and physical health.Design: A longitudinal design that included four time-point measurements across 15 months.Setting: A medical rehabilitation center in Germany.Population: Participants included 201 patients who were recruited from a medical rehabilitation center.Methods: To objectively measure physical fitness (lung functioning), oxygen reabsorption at anaerobic threshold (VO2AT) was used, along with several self-report scales.Results: We found a nonlinear change in mental health among medical rehabilitation patients. The results underscored the importance of medical rehabilitation for patients’ mental health over time. In addition, patients’ physical health was stable over time. The initial level of physical fitness (VO2AT) positively predicted their mental health and kept the trend more stable. Self-efficacy appeared to have a positive relationship with mental health after rehabilitation treatment.Conclusions: This study revealed a nonlinear change in mental health among medical rehabilitation patients. Self-efficacy was positively related to mental health, and the initial level of physical fitness positively predicted the level of mental health after rehabilitation treatment.Clinical Rehabilitation: More attention could be given to physical capacity and self-efficacy for improving and maintaining rehabilitants’ mental health.
7 January 2022 in Computational Intelligence and Neuroscience
Building information modeling (BIM) is evolving as a digital infrastructure model for innovation in the construction field. The innovation-enabling potential of BIM has been highly neglected in the literature. This study explores the innovative potential of BIM, specifically its value in enabling construction innovation (CI). Through reflective research and a literature review, the relationship between BIM and CI is redefined, BIM-CI’s value spectrum and underlying mechanisms are mapped and their required resources and activities are illustrated. The results indicate that different BIM applications provide various proinnovation environments wherein CI may flourish. Extra attention should be paid to BIM-enabled systematic collaborative innovation and digital innovation ecosystems with BIM as the core infrastructure that integrates the physical space with cyberspace to accelerate radical innovation. This study extends BIM management research by considering digital innovation and providing a new perspective for CI management theory and practice. The results will provide academics with a solid point of departure for developing relevant research and serve as a reference for practitioners who intend to utilize BIM for efficient innovation in construction projects.