Mi Liu

Mi Liu

Auto-generated profile, based on publicly available information

Mi Liu

Key Laboratory of Earth Prospecting and Information Technology, China University of Petroleum (Beijing), Beijing, 102249, China

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 September 2019 in Journal of Petroleum Science and Engineering
Verified
Journal Article
Closed access
GJGuowen Jin
Guowen Jin
RXRanhong Xie
Ranhong Xie
MLMi Liu
Mi Liu
JGJiangfeng Guo
Jiangfeng Guo
LGLun Gao
Lun Gao

24 September 2016 in Journal of Intelligent Systems
Verified
Journal Article
Open access
PDF file
MLMi Liu
Mi Liu
SYShuping Yi
Shuping Yi
CJChrist Jimmyh
Christ Jimmyh
HSHaicao Song
Haicao Song
Manufacturing resources are shared and centrally managed on the cloud platform in cloud manufacturing, which is a new model of modern manufacturing. The production data are collected, which can be used to predict the manufacturing events. Based on those, disruption problems of scheduling should be researched from a new point of view. In this paper, new job arrivals were considered as the disruption event. The time of the occurrence of disruption was predictable in contrast to uncertainty. Alternative subcontractors chosen from the cloud platform were available for outsourcing with different processing prices and transporting distances. The objective of the original scheduling, the deviation between the new schedule and the old one, and the outsourcing cost were all considered. To express the problem, mathematical models and a three-field notation model were constructed. To solve the problem, a hybrid quantum-inspired chaotic group leader optimization algorithm was proposed, in which a hybrid encoding way was applied. To verify the algorithm, experiments were carried out. The results showed that the proposed algorithm performs well.

15 September 2016 in Journal of Intelligent Systems
Verified
Journal Article
Open access
PDF file
HSHaicao Song
Haicao Song
SYShuping Yi
Shuping Yi
MLMi Liu
Mi Liu
GQGaoyang Qin
Gaoyang Qin
A large number of changeovers exist in multi-item and small lot size production mode, which lead to a long setup time and significantly influence productivity. However, setup time has received significantly less attention in previous studies regarding the single machine scheduling (SMS) problem. This paper investigates the SMS problem with sequence-dependent setup time (SDST). First, a model of SMS-SDST is developed to minimise the makespan. An earliest due date (EDD), SDST, and ant colony optimisation (ACO) heuristic algorithm is presented. In order to evaluate the performance of the proposed algorithm, Taguchi’s robust design method is employed to define the best parameter values. Related results are analysed by statistical tools. The computational experiments are compared with an ACO algorithm and a genetic algorithm. The experimental results and statistical analyses show that the proposed EDD-SDST-ACO is effective for the problem.