Xun Mao

Xun Mao

Auto-generated profile, based on publicly available information

Xun Mao

State Grid AnHui Electric Power Research Institute, Hefei 230061, China

Research Focus & Metrics

Academic Career Length

1Year (2026-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 July 2026 in Machines
Verified
Journal Article
Open access
PDF file
Zhenhuan DingZhenhuan Ding
Zhenhuan Ding
JLJin Lv
Jin Lv
ZDZhenhuan Ding
Zhenhuan Ding
KLKai Lv
Kai Lv
XMXun Mao
Xun Mao
QZQianqian Zhang
Qianqian Zhang
As the operation modes and maintenance management requirements of power grids become increasingly complex, the optimization of monthly outage maintenance schedules faces challenges such as difficulty in multi-department coordination, high reliance on manual experience, and insufficient adaptability to dynamic demands. To address these issues, this paper proposes a collaborative optimization method for monthly outage schedules of power grids based on a large language model and reinforcement learning. The method uses the large language model to parse natural language requirements raised in balance meetings, converting requirements such as fixed maintenance dates, duration adjustments, and forbidden maintenance periods into structured constraint parameters. Subsequently, the small reinforcement learning model based on Dueling Deep Q-Network (Dueling DQN) re-optimizes the outage schedule according to the updated environment parameters, achieving a collaborative solution from meeting requirement parsing to schedule generation. Case study results on the IEEE 39-bus system show that the proposed method can integrate the dynamic requirements arising from multiple rounds of balance meetings and perform adaptive optimization of the outage schedule under different constraint conditions. Experimental results on the IEEE 39-bus system demonstrate that the proposed framework effectively optimizes monthly outage schedules. Compared with the initial schedule, the proposed method reduces monthly voltage violations by 31 times and decreases active power loss by 35.88 MWh.