Hong Zhang

Hong Zhang

Auto-generated profile, based on publicly available information

Hong Zhang

Southeast University

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2021 in Energy Reports
Verified
Journal Article
Open access
XHXinyi Hu
Xinyi Hu
YXYiming Xiang
Yiming Xiang
HZHong Zhang
Hong Zhang
QLQi Lin
Qi Lin
WWWei Wang
Wei Wang
HWHaining Wang
Haining Wang

18 June 2022 in Building Research & Information
Verified
Journal Article
Closed access
YXYiming Xiang
Yiming Xiang
JBJiachen Bu
Jiachen Bu
KZKe Zhu
Ke Zhu
KMKehan Ma
Kehan Ma
ALEX OPOKUALEX OPOKU
ALEX OPOKU
YWYanhua Wu
Yanhua Wu
The spread of COVID-19 has caused an increasing demand for public medical rooms, especially in Chinese rural regions. Industrialized building techniques have been shown as capable of fulfilling this demand through the case of the Leishenshan Hospital. However, industrialized construction requires developed technologies and infrastructures, which are often non-existent in rural areas, thus making it difficult to replicate such a feat. Therefore, more suitable solutions for Chinese rural project delivery in the pandemic scenario are needed. Considering the constraints of pandemic prevention and rural applicability, the adaptive industrialized construction (AIC) method has potential as an alternative. This study evaluates the application of AIC by comparing simulated results using AIC and a conventional method, based on five evaluation indicators: construction speed, labourer distribution, material consumption, equipment utilization, and cost. Taking an actual project as the sample building, the results indicate that the AIC method has several advantages. These include a shorter construction period, less labourer gathering onsite, and a lower cost, suggesting it may be an effective solution for rural project delivery during the pandemic. Architects and contractors could employ the same evaluation method to explore more solutions and optimize the construction schedule for future rapid construction needs in rural areas in a pandemic.