Meysam Pourarshad

Meysam Pourarshad

Auto-generated profile, based on publicly available information

Meysam Pourarshad

Department of Energy Engineering and Economics, Science and Research Branch, Islamic Azad University, Tehran, Iran

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2015 in Geothermics
Verified
Journal Article
Closed access
Younes NoorollahiYounes Noorollahi
Younes Noorollahi
MPMeysam Pourarshad
Meysam Pourarshad
Saeid JalilinasrabadySaeid Jalilinasrabady
Saeid Jalilinasrabady
Hossein YousefiHossein Yousefi
Hossein Yousefi

24 March 2017 in IET Renewable Power Generation
Verified
Journal Article
Open access
PDF file
Younes NoorollahiYounes Noorollahi
Younes Noorollahi
MPMeysam Pourarshad
Meysam Pourarshad
AVAlireza Veisi
Alireza Veisi
Renewable energies need high investment and they have lower efficiency rather than fossil fuels. So methods have to be devised to increase efficiency and to decrease investing cost. Here the combination of geothermal with solar has been proposed. The geothermal heat extraction from an abandoned oil well in Ahwaz oil field (DQ) was simulated and also a binary cycle power plant has been designed. Using this well, the cost of drilling and casing is eliminated. The system is assisted by combining of two solar power production systems. The first system is photovoltaic (PV) which works parallel to geothermal binary cycle. The second system that is concentrated solar thermal (CST) system is using parabolic trough collector to generate heat for super heating geothermal binary cycle. Although CST has more problems than photovoltaic (PV) in terms of setups, maintenance and the ease of transfer, due to the possibility of storing thermal energy when there is no sunlight, it has compatibility and ability to increase more efficiency in collaboration with geothermal binary cycle. The collaboration of CST with geothermal results in 23.5% increase in power generation in a year, while this figure equals to 15.7% for PV with geothermal.

21 September 2020 in International Journal of Sustainable Energy
Verified
Journal Article
Closed access
MPMeysam Pourarshad
Meysam Pourarshad
Younes NoorollahiYounes Noorollahi
Younes Noorollahi
FAFarideh Atabi
Farideh Atabi
MPMostafa Panahi
Mostafa Panahi
The power supply and demand have been studied, modelled, analysed, and foresighted as one of the most important energy carriers. The Business as usual (BAU) scenario was compared based on continuing the status quo with seven other proposed possible scenarios up to the horizon 2050. Possible solutions such as demand management, increased productivity, upgrading power plant technology, and development of energy resources attempt to reduce electricity demand, as well as improving and promoting the share of renewable energies in power generation and reducing emissions. The cost–benefit technique has also been used to analyse the economic and environmental benefits. As a results, a Khuzestan electricity policy scenario that has a well-coordinated and cost-effective solution for both supply and demand. It is preferred scenario for flexibility and stability of grid with a $3,549 million profit with 35% renewable energy share.