Eduardo Santos Telles

Eduardo Santos Telles

Auto-generated profile, based on publicly available information

Eduardo Santos Telles

Post-Graduate Program in Production Engineering and Systems – PPGEPSUNISINOS, Research Group on Modeling for Learning – GMAP, UNISINOS, São Leopoldo, Brazil

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2020 in International Journal of Production Economics
Verified
Journal Article
Closed access
ETEduardo Santos Telles
Eduardo Santos Telles
Daniel Pacheco LacerdaDaniel Pacheco Lacerda
Daniel Pacheco Lacerda
MMMaria Isabel Wolf Motta Morandi
Maria Isabel Wolf Motta Morandi
FPFabio Antonio Sartori Piran
Fabio Antonio Sartori Piran

20 May 2022 in Journal of Manufacturing Technology Management
Verified
Journal Article
Closed access
ETEduardo Santos Telles
Eduardo Santos Telles
Daniel Pacheco LacerdaDaniel Pacheco Lacerda
Daniel Pacheco Lacerda
MMMaria Isabel Wolf Morandi
Maria Isabel Wolf Morandi
RERodrigo Ellwanger
Rodrigo Ellwanger
Fernando Bernardi de SouzaFernando Bernardi de Souza
Fernando Bernardi de Souza
FPFabio Antonio Sartori Piran
Fabio Antonio Sartori Piran
Purpose: Drum-Buffer-Rope (DBR) is a method to adjust production flows, synchronize the release of materials and enable a process of focused improvement in production systems. Literature on DBR applications in engineer-to-order (ETO) production systems, where customers participate in product design decisions and, consequently, in the way production is planned and executed, is rare. However, the interest in improving production management in ETO systems has received attention from the scientific and business communities. The goal of this research was to evaluate the implementation of DBR in an ETO productive system, critically analyzing the necessary adaptations for its use.Design/methodology/approach: This research was conducted through a case study in a company that manufactures electronic equipment, known as avionics, in the aerospace sector.Findings: In this context, the contribution of this study consists of evaluation of the implementation of DBR in an ETO productive system, describing the implementation and the necessary adaptations of the DBR to the ETO productive system explored, comparing it with the DBR theoretical proposals and Simplified Drum-Buffer-Rope (S-DBR) methods.Originality/value: The study contributes to knowledge by expanding the field of the DBR application to make it more precise, and by applying the theory of constraints, in a general manner, to this type of productive environment.


2 October 2026 in SSRN Electronic Journal
Verified
Preprint
Open access
ETEduardo Santos Telles
Eduardo Santos Telles
Daniel Pacheco LacerdaDaniel Pacheco Lacerda
Daniel Pacheco Lacerda
LGLeandro Gauss
Leandro Gauss
RORaymond Opdenakker
Raymond Opdenakker
ACAna Maria Cunha Ribeiro Dos Santos Ponces Camanho
Ana Maria Cunha Ribeiro Dos Santos Ponces Camanho
The semiconductor industry commits capital years ahead of returns while the boundary of best practice keeps moving, so locating that boundary and tracking movement relative to it is a recurring problem. Porter's productivity frontier names the boundary, and the reading adopted here is that it admits several efficient positions at once and is displaced over time, yet neither property has been observed over a long horizon at the scale of a whole industry. This study estimates the financial efficiency frontier of the global semiconductor industry with data envelopment analysis (DEA). Twenty companies holding about 78% of sector market capitalization, in five clusters, were observed over 2005 to 2025, giving 415 observations. Input-oriented models under constant and variable returns to scale were estimated on annual industry frontiers, the Malmquist index separated catch-up from frontier displacement, and cumulative change was measured against a pooled metafrontier. Productivity change came from frontier displacement rather than from catch-up, with technological change at 1.016 against efficiency change at 0.990, a decomposition that holds under every specification tested. Cumulative change of 1.063 for the industry conceals a dispersion from 1.78 for Broadcom to 0.61 for Intel, so frontier proximity and frontier advance are empirically distinct. Technical underperformance outweighs scale misalignment as the source of frontier distance in three of five clusters, and scale dominates in Foundries and IDM Logic. The study renders the two structural properties of Porter's productivity frontier observable in one industry over twenty-one years and delivers a cluster-calibrated diagnostic separating scale-driven from capability-driven disadvantage.