Ashok Sekar

Ashok Sekar

Auto-generated profile, based on publicly available information

Ashok Sekar

National Renewable Energy Laboratory, 15013 Denver W Pkwy., Golden, CO 80401, USA

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 May 2022 in iScience
Verified
Journal Article
Open access
NWNicholas Willems
Nicholas Willems
ASAshok Sekar
Ashok Sekar
BSBenjamin Sigrin
Benjamin Sigrin
VRVarun Rai
Varun Rai
Failing to incorporate accurate distributed energy resource penetration forecasts into long-term resource and transmission planning can lead to cost inefficiencies at best and system failures at worst. We have developed an open-source tool that employs an advanced Bass specification to calibrate and forecast technology adoption. The advanced specification includes geographic clustering, exogenously estimated market size, and dynamic time steps. Training on historical adoption of rooftop photovoltaics at the U.S. county-level and using detailed techno-economic estimates, our model achieves a two-year average mean-absolute-percentage-error of 19% in predicting system counts at the county-level, weighted by population. Model error was negatively correlated with market maturity—the error was 12% for counties in states with at least 28 W-per-capita of installed capacity. The advanced specification significantly reduces unweighted forecasting percent error compared to a conventional Bass specification: from 196% to 25% for capacity and from 226% to 22% for system count.

15 November 2018 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
ASAshok Sekar
Ashok Sekar
VRVarun Rai
Varun Rai
Latent constructs are fundamental for theory-building and practice in various disciplines of the social sciences. Passive datasets and machine learning approaches provide an opportunity to predict latent constructs, thereby offering a strong potential to build scalable, granular, and theory-grounded models for various phenomena of interest in social sciences. However, there is little guidance for researchers to develop prediction models for latent constructs, especially given that latent constructs are different from observable variables in several keys ways. To address this gap, and drawing from both theoretical and applied literature across the social sciences, we first develop a taxonomy to classify latent construct models based on their ontology and measurement. Second, we synthesize the relevant literature on using passive data to predict latent constructs. Finally, by applying the developed taxonomy to various applications in the literature, we offer guidance on data selection and validation – two key steps in the prediction process. By bringing together loosely tied research in the context of scaling up latent construct models, this paper makes two significant contributions: 1) identify key significant and specific gaps in this research area, 2) provide theoretically- and empirically-grounded guidance for social scientists interested in using passive data for developing scalable latent variable models.

20 October 2026 in SSRN Electronic Journal
Verified
Preprint
Open access
ASAshok Sekar
Ashok Sekar
PDParitosh Das
Paritosh Das
MLMinhua Long
Minhua Long
MTMargaret Taylor
Margaret Taylor
PBPeter Benoliel
Peter Benoliel
DSDavid Stevens
David Stevens
The co-adoption of distributed energy resources (DERs) – including solar photovoltaics, battery storage, and electric vehicles – offers synergistic benefits that exceed those of individual technologies. This study applies the Technology Value Mapping (TVM) framework to assess stakeholder-specific perspectives on DER co-adoption and to identify both the values of co-adoption and the barriers to broader uptake. Two workshops with participants representing consumers, regulators, developers, and utilities elicited stakeholder-identified values and perceived challenges related to DER adoption and co-adoption. Our exploratory workshops suggest that co-adoption amplifies economic, resilience, and technical value for all stakeholder groups. Widespread co-adoption is constrained, however, by affordability concerns, interoperability issues, regulatory fragmentation, and incentive misalignment. Analysis across stakeholders surfaced five systemic barrier types: information asymmetry, economic tension, regulatory complexity, infrastructure dependency, and trust deficits. These barriers frequently span stakeholder boundaries, requiring joint solutions especially between utilities and regulators. The study extends the application of TVM in this context and highlights the need for cross-sectoral strategies to scale DER co-adoption.