1 April 2026 in Journal of Instrumentation
Precise time synchronization among multiple electronic channels is essential for nuclear physics experiments. In digital data acquisition systems based on XIA Pixie-16 modules, the relative timing between channels is not necessarily preserved when a new data acquisition run is started. A run-dependent timing offset — typically on the order of 10 ns — can occur independently in each channel, which cannot be corrected through offline data analysis alone. To address this issue, a dedicated external electronic circuit is developed. This circuit operates as a programmable double-throw switch that routs a common reference clock signal to all channels at the start of each run, before switching to normal physics data acquisition. This procedure enables direct measurement and thus correction of relative timing offsets for all channels on a run-by-run basis without manual intervention. The method has been successfully applied in a nuclear reaction experiment using multiple Pixie-16 modules, where it effectively corrects the run-dependent timing offset and thus significantly improves the accuracy of timing-dependent observables such as Parallel Plate Avalanche Counter(PPAC) position reconstruction and beam tracking.
1 May 2026 in Journal of Instrumentation
Double parallel-plate avalanche counters (DPPACs), each comprising two PPACs with delay-line readout for two-dimensional position determination, have been developed at Institute of Modern Physics, Chinese Academy of Sciences. The detector was tested with a standard α source, achieving a position resolution of about 0.4 mm. Each PPAC measures particle hit positions in two dimensions, with the dual configuration enhancing overall detection efficiency. Two DPPACs were deployed in a month-long experimental campaign at the Radioactive Ion Beam Line in Lanzhou (RIBLL1) with secondary beams of 10 Be and 10,11,16 C, and faint 18 O primary beam at typical intensities of 1.2–1.5 × 10 5 Hz, yielding a stable single DPPAC-detection efficiency > 90% and a typical in-beam position resolution ≈ 0.56 mm. This successful deployment addresses a critical domestic need for reliable, high-resolution beam monitoring and establishes a robust technological foundation for future experiments.
1 June 2026 in Journal of Instrumentation