Taryn Jane Bond-Barnard

Taryn Jane Bond-Barnard

Auto-generated profile, based on publicly available information

Taryn Jane Bond-Barnard

Department of Engineering & Technology Management University of Pretoria Lynnwood Rd 0002 Hatfield Pretoria South Africa

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 April 2018 in International Journal of Managing Projects in Business
Verified
Journal Article
Open access
TBTaryn Jane Bond-Barnard
Taryn Jane Bond-Barnard
LFLizelle Fletcher
Lizelle Fletcher
HSHerman Steyn
Herman Steyn
Purpose: The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear. Design/methodology/approach: In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success. Findings: The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust. Practical implications: The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues. Originality/value: This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.

30 November 2022 in International Journal of Information Systems and Project Management
Verified
Journal Article
Open access
PDF file
KSKurt Swart
Kurt Swart
TBTaryn Bond-Barnard
Taryn Bond-Barnard
RCRitesh Chugh
Ritesh Chugh
Technological advancements, globalization, and the COVID-19 pandemic have transformed digital communication into a central tenet of many project management virtual teams (VTs). However, successful VTs are dependent on communication, collaboration and knowledge sharing among team members. Through a systematic literature review, this study investigates the challenges and critical success factors of digital communication, collaboration, and knowledge sharing in project management VTs. As a result, eight key common themes were identified - trust, cultural diversity, collaboration tools and technology, communication and knowledge hoarding, leadership, psychological safety, communication guidelines and training, and resource planning. Furthermore, given the geographically dispersed nature of VTs, they face additional challenges than teams that interact face-to-face (in-person). Therefore, mitigating the challenges by focusing on the identified themes could lead to project success.

1 October 2013 in International Journal of Project Management
Verified
Journal Article
Closed access
TBTaryn Jane Bond-Barnard
Taryn Jane Bond-Barnard
HSHerman Steyn
Herman Steyn
IFInger Fabris-Rotelli
Inger Fabris-Rotelli

30 June 2016 in Acta Structilia 23(2)
Verified
Journal Article
Open access
PDF file
TBTaryn Bond-Barnard
Taryn Bond-Barnard
LFLizelle Fletcher
Lizelle Fletcher
HSHerman Steyn
Herman Steyn
Growth in computer-mediated communication (CMC) technologies such as instant messaging (IM) and video conferencing (VC) has led to a need to explore the utilisation and influence of these tools on the quality of project communication, which must still be established. This article reports the results of a survey conducted among 210 project practitioners using CMC in various industries to determine how, why and what each medium is used for, and how these media influence factors that promote quality communication. Some results showed that the use of both instant messaging and video conferencing in projects is moderate and both improve the quality of communication in virtual teams, however in different ways.


23 January 2017 in South African Journal of Information Management
Verified
Journal Article
Open access
PDF file
MSMarius C. Smit
Marius C. Smit
TBTaryn J. Bond-Barnard
Taryn J. Bond-Barnard
HSHerman Steyn
Herman Steyn
IFInger Fabris-Rotelli
Inger Fabris-Rotelli
Background: Project success used to be measured solely in terms of efficiency metrics such as scope, cost and time; however, there are proposals that more attention should be paid to process-related performance factors such as communication. The advent of email has significantly impacted the way the world communicates.Objectives: This study investigates the preference of email communication relative to other communication mediums in project environments and the effect of email communication on feelings of stress and overload in the workplace.Method: A survey with 430 responses was conducted to determine the communication preferences of project practitioners in a typical project. The average rank and frequency response methods were used to analyse the data.Results: The findings indicate that the communication preferences of project practitioners still support the media richness theory and that face-to-face communication is the preferred communication medium in most situations. Despite email being disruptive and a cause of stress, the respondents did not indicate being overloaded because of email.Conclusion: Even though there has been a dramatic shift towards email and electronic communication in projects, face-to-face communication is still the most preferred communication type for most situations. Furthermore, email is perceived as an effective tool to delegate, can be used to build and develop relationships and trust, and is an efficient and effective tool that contributes to project communication success.