Omid Habibzadeh-Bigdarvish

Omid Habibzadeh-Bigdarvish

Auto-generated profile, based on publicly available information

Omid Habibzadeh-Bigdarvish

Department of Civil Engineering, The University of Texas at Arlington, Arlington, Texas, USA

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Sustainable Cities and Society
Verified
Journal Article
Closed access
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
Xinbao YuXinbao Yu
Xinbao Yu
GLGang Lei
Gang Lei
TLTeng Li
Teng Li
APAnand J. Puppala
Anand J. Puppala

1 December 2018 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
DSDonatella Sterpi
Donatella Sterpi
AAAdriana Angelotti
Adriana Angelotti
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
DJDaniel Jalili
Daniel Jalili

1 December 2020 in Journal of Cleaner Production
Verified
Journal Article
Closed access
GLGang Lei
Gang Lei
XYXinbao Yu
Xinbao Yu
TLTeng Li
Teng Li
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
XWXiang Wang
Xiang Wang
CLCheng Luo
Cheng Luo

1 June 2020 in Applied Thermal Engineering
Verified
Journal Article
Closed access
TLTeng Li
Teng Li
XYXinbao Yu
Xinbao Yu
GLGang Lei
Gang Lei
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
MHMark Hurley
Mark Hurley

30 April 2023 in Experimental Heat Transfer
Verified
Journal Article
Closed access
GLGang Lei
Gang Lei
TLTeng Li
Teng Li
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
Xinbao YuXinbao Yu
Xinbao Yu
A comprehensive understanding of the heat transfer mechanism of hydronically-heated structures is crucial to predicting their heating performance. However, few studies considered the heat transfer at the interface of heating pipe and host material. In this paper, heat transfer at two critical interfaces for hydronically-heated concrete structures, e.g. pipe-concrete interface and concrete-air interface, has been tested and analyzed. Two concrete blocks, one with an embedded cross-linked polyethylene (PEX) pipe and one with an attached PEX pipe, were fabricated to represent heated bridge decks for the heat transfer study. The two blocks were tested inside a freezer box in a series of heating response tests at varied room and fluid temperatures. Measured temperatures at different depths were used to find the convection heat transfer coefficient and the thermal contact conductance between the concrete and PEX pipe through equations developed via finite difference method (FDM). Finite element models (FEM) of the two blocks were developed to verify the thermal contact values derived from a 1-D thermal resistance model. A comprehensive analysis of the temperature response of the models was performed, especially at the two interfaces, and the FEM models were able to predict the lab measurements accurately. The obtained contact heat transfer coefficient and the FEM models can be used for all hydronically-heated structures.

21 March 2019
Verified
Conference Paper
Closed access
GLGang Lei
Gang Lei
NKNice Kaneza
Nice Kaneza
XYXinbao Yu
Xinbao Yu
TLTeng Li
Teng Li
OHOmid Habibzadeh-Bigdarvish
Omid Habibzadeh-Bigdarvish
Coupled thermo-hydro-mechanical (THM) processes are of great importance to geothermal, hydrology, and geotechnical engineering applications. There is a lack of laboratory testing apparatuses to measure the THM processes under controlled true 1-D heating conditions. This paper develops a modified 1-D heat soil cell for the study of THM processes. This soil cell consists of a double acrylic test column and a heating plate at the bottom plate to control the temperature gradient. The test cells are equipped with thermocouples to monitor the temperature changes during heating processes. Two tests are conducted with the boundary temperatures at 50 and 70°C, respectively. Test results show nearly linear axial and radial temperature profiles in the inner soil column. The temperature profiles for the outer soil column are also obtained, showing a significant influence of room temperature on the outer column. The time to reach steady-state temperature for both tests is the same, which is 6 h. A infrared camera was also used to visualize the temperature distribution of the column top surface.