1 January 2020 in Advances in Civil Engineering
Effective measures are needed to strictly control soil displacement caused during the process of shield construction excavation for urban subway tunnels. When calculating the displacement of soil caused by loading or unloading, many previous analytical studies have assumed that the soil was a linear elastic body and ignored the viscosity of the soil. In this study, the Boltzmann viscoelastic model and the Mindlin basic solution were combined to consider the effects of the additional support pressures, the shield shell frictions, the grouting pressures, and the ground loss, and a three‐dimensional viscoelastic solution for soil displacement caused by shield tunneling was derived. According to the calculation results of an example, the analytical solution was able to consider the asynchronous construction of the left and right tunnels and the mutual influence of the double shield tunnel. The rationality of the approach proposed in this study was verified by comparing the theoretical solution with the measured settlement values. In addition, the influence of differences in the viscoelastic parameters (the viscosity coefficient, the shear modulus of the elastic element, and the shear modulus of the viscous element) and the geometric parameters (the distance from the excavation surface, the calculated depth, and tunnel spacing) on soil displacement is discussed. The calculation method in this study provides a theoretical basis for predicting the three‐dimensional soil deformation caused by shield tunneling, especially in soft clays.
19 March 2020 in Mathematical Problems in Engineering
The construction of shield tunnels inevitably causes displacement of the surrounding soil and additional stress and deformation of the buried pipeline. An energy solution for predicting the deformation of buried pipelines caused by tunneling is proposed in this study. First, based on the uniform ground movement model, the interval of the free displacement field of soil around the pipeline induced by tunneling is calculated. Then, we use the Pasternak model to establish the total potential energy equation of the tunnel-soil-pipeline interaction. The final settlement interval of the pipeline is obtained by solving the numerical calculation program with MATLAB. The calculation results of the energy solution are compared with the results of the centrifugal test and the reported theoretical solutions of Winkler and Pasternak, and then the applicability of the solution for predicting the pipeline response under different geotechnical conditions is verified. Combined with an engineering case, the energy method calculation results, numerical simulation results, and measured results are compared to obtain the most unfavorable position of the pipeline caused by tunneling. At the end of this study, the application steps of the proposed method in actual construction are summarized. These steps are used to predict pipeline response in order to take protective measures.
1 January 2021 in Advances in Civil Engineering
Shielding tunnel construction always has negative impacts on the surrounding buildings. Because of repeated disturbances caused by the construction, more attention should be paid to the impacts of the nonsynchronous construction of a twin‐tunnel. In this research, a three‐dimensional model was established to simulate the construction process of a twin‐tunnel in a section of the Hefei No. 4 metro line, and the calculation results were validated with the measured settlement data. Based on the model, the ground settlement and the existing pipeline responses were studied in detail. The results showed that, after the first tunnel (FT) construction, the settlement curves conformed to a Gaussian distribution. Additionally, after the second tunnel (ST) construction, the final settlement curves were no longer completely symmetrical. The influences of the twin‐tunnel space and the pipeline‐soil relative stiffness on the settlements were further studied. The results showed that the final settlement curves of the ground surface and the pipeline were mainly W‐shaped, U‐shaped, and V‐shaped. As the twin‐tunnel space increased and the pipeline‐soil relative stiffness decreased, the settlement curve gradually changed from V‐shaped to W‐shaped. C was defined as the ratio of two maximum settlements in the W‐shaped settlement curve. As the space increased, C started to decrease from 1 and then increased to 1.