The integrated systems dynamics model WORLD6 was used to assess long-term supply of stainless steel to society with consideration of the available extractable amount of raw materials. This was done handling four metals simultaneously (iron, chromium, manganese, nickel). We assessed amounts of stainless steel that can be produced in response to demand and for how long, considering the supply of the alloying metals manganese, chromium and nickel. The extractable amounts of nickel are modest, and this puts a limit on how much stainless steel of different qualities can be produced. The simulations indicate that nickel is the key element for stainless steel production, and the issue of scarcity or not depends on how well the nickel supply and recycling systems are managed. The study shows that there is a significant risk that the stainless steel production will reach its maximum capacity around 2055 and slowly decline after that. The model indicates that stainless steel of the type containing Mn–Cr–Ni will have a production peak in about 2040, and the production will decline after 2045 because of nickel supply limitations. Production rates of metals like cobalt, molybdenum, tantalum or vanadium are too small to be viable substitutes for the missing nickel. These metals are limiting on their own as important ingredients for super-alloys and specialty steels and other technological applications. With increased stainless steel price because of scarcity, we may expect recycling to go up and soften the decline somewhat. At recycling degrees above 80%, the supply of nickel, chromium and manganese will be sufficient for several centuries.
19 May 2020 in Biophysical Economics and Sustainability
The sustainability of the helium production, supply and use was assessed using the WORLD7 integrated model. The use of helium is at present concluded to be unsustainable with respect to long-term supply security, because of lack of significant recycling. There is no risk for significant helium scarcity in the short term (before 2030), but in the long term, the scarcity risk is unavoidable under business as usual. The helium supply runs into limitations by 2090, under business as usual and supply declines after that. The study shows that the present helium recycling rate is far too low, causing helium to be squandered in one-way use and that is driving helium prices up. A scenario analysis with the WORLD7 model suggests that a sustained program for helium recycling and demand management, combined with political efforts to ban unnecessary use, will be able to significantly improve the long-term helium supply situation. The outputs show that such efforts may be sufficient for avoiding any scarcity under the demand assumptions taken.
26 January 2021 in Mining, Metallurgy & Exploration
The long-term supply of nickel to society was assessed with the WORLD7 model for the global nickel cycle, using new estimates of nickel reserves and resources, indicating that the best estimate of the ultimately recoverable resources for nickel is in the range of 650–720 million ton. This is significantly larger than earlier estimates. The extractable amounts were stratified by extraction cost and ore grade in the model, making them extractable only after price increases and cost reductions. The model simulated extraction, supply, ore grades, and market prices. The assessment predicts future scarcity and supply problems after 2100 for nickel. The model reconstructs observed extraction, supply and market prices for the period 1850–2020, and is used to simulate development for the period 2020–2200. The quality of nickel ore has decreased significantly from 1850 to 2020 and will continue to do so in the future according to the simulated predictions from the WORLD7 model. For nickel, extraction rates are suggested to reach their maximum value in 2050, and that most primary nickel resources will have been exhausted by 2130. After 2100, the supply per capita for nickel will decline towards exhaustion if business-as-usual is continuing. This will be manifested as reduced supply and increased prices. The peak year can be delayed by a maximum of 100 years if recycling rates are improved significantly and long before scarcity is visible.