Johann L. Hemmerich

Johann L. Hemmerich

Auto-generated profile, based on publicly available information

Johann L. Hemmerich

Karlsruhe Institute of Technology, Karlsruhe, Germany

Research Focus & Metrics

Academic Career Length

37Years (1990-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 1992 in Fusion Technology
Verified
Journal Article
Closed access
DWD P Wong
D P Wong
JHJ L Hemmerich
J L Hemmerich
JMJ J Monahan
J J Monahan
This paper describes the engineering, construction and installation of the Exhaust Detritiation System for the JET Active Gas (Tritium) Handling Plant. Commissioning results without tritium indicated that the system has met the design requirements and operating parameters. Hydrogen and methane were fully oxidized. Dew point of −60°C was observed in the drier outlet. Tests carried out with substances potentially harmful to the performance of the recombiner catalyst indicated no significant change in hydrogen oxidation performance. However, methane oxidation was significantly reduced. Furthermore, the acidic decomposition products of these substances would damage the equipment in the system after extended exposure. Admission of these and chemically similar substances must be avoided to maintain the performance of the Exhaust Detritiation System.

1 January 1990 in Journal of Vacuum Science & Technology A
Verified
Journal Article
Closed access
JHJ. L. Hemmerich
J. L. Hemmerich
EKE. Küssel
E. Küssel

1 October 1995 in Fusion Technology
Verified
Journal Article
Closed access
RLR Lässer
R Lässer
GJG Jones
G Jones
JHJ L Hemmerich
J L Hemmerich
RSR Stagg
R Stagg
JYJ Yorkshades
J Yorkshades
The preparative Gas Chromatographic (GC) system for the JET Active Gas Handling System (AGHS) can separate a daily throughput of up to 20 moles of hydrogen isotope gas mixture into the pure products of T2, D2, and H2 with very small interfractions in between. Design, assembly and special parts of the GC system, the various steps of the gas chromatographic process including safety aspects, control system and results of the inactive commissioning are presented. The GC system fulfils its specifications for isotope separation. We also describe a simple program to calculate the hydrogen isotope profiles in the columns of the GC system.

1 October 1995 in Fusion Technology
Verified
Journal Article
Closed access
ABA C Bell
A C Bell
JHJ L Hemmerich
J L Hemmerich
RLR Lässer
R Lässer
NBN Bainbridge
N Bainbridge
GBG Bishop
G Bishop
JYJ Yorkshades
J Yorkshades
The Joint European Torus (JET) carried out the first preliminary experiment with a deuterium-tritium plasma in 1991. This utilised an on-site inventory of 0.25g. The future experimental programme for the JET machine includes two discrete phases using plasmas fuelled by deuterium and tritium. The first of these, in mid-1996, will generate around 2 × 1020 neutrons and require a site inventory of a few grams of tritium. The second is proposed to take place in 1999 if an extension to the JET project from 1996 is granted. This will require a few tens of grams of tritium and will generate up to 5 × 1021 neutrons. The JET Active Gas Handling System has been constructed to enable tritium to be recovered from the plasma exhaust and stored for re-injection. The design also minimises tritium discharges to the environment. It is currently being commissioned to meet the above programme and has been modified to take into account a new requirement for operation over extended periods during maintenance and D-D operation with tritium contaminated plasma exhaust. Commissioning of the Active Gas Handling System consists of inactive, trace tritium (∼40TBq) and full tritium (<3g) phases. The experience and main results of inactive commissioning are presented and the status of tritium commissioning is reviewed.

1 October 1995 in Fusion Technology
Verified
Journal Article
Closed access
RLR Lässer
R Lässer
BGB Grieveson
B Grieveson
JHJ L Hemmerich
J L Hemmerich
RSR Stagg
R Stagg
KWK Walker
K Walker
The Analytical Laboratory (AN) of the JET Active Gas Handling System (AGHS) is a central facility of the AGHS connected via small bore tubes to the other AGHS sub-systems. It offers various techniques such as gas chromatography, mass spectrometry, ionisation chambers, katharometers and calorimetry, to characterise the various gas samples. The detection ranges of the gas chromatograph for the six hydrogen molecules, helium, nitrogen and oxygen are from about 100ppm to 100% and for methane, higher hydrocarbons, CO and CO2 from about 10ppm to 100% with a thermal conductivity detector and a flame ionisation detector, respectively. Similar detection ranges can be achieved with the quadrupole and omegatron mass spectrometers. In addition tritiated hydrogen and hydrocarbons will be detected with flow proportional counter detectors and ionisation chambers down to the low ppm range. Inactive commissioning results will be presented.

1 October 1995 in Fusion Technology
Verified
Journal Article
Closed access
JLJ Lupo
J Lupo
JHJ L Hemmerich
J L Hemmerich
RLR Lässer
R Lässer
JYJ Yorkshades
J Yorkshades
JSJ L Salanave
J L Salanave
The Impurity Processing (IP) system is designed to recover tritium from tritiated compounds (Q2O, CxQy, NQ3, with Q = H, D, T and x>=1, y>=4) collected from the JET torus or generated during the processing of gases inside the Active Gas Handling System (AGHS). The recovery process involves dilution of the impurities in helium, addition of oxygen, recirculation of the helium-impurities-oxygen mixture over a hot recombiner (773K) to generate water and CO2, and trapping of the water on 160K cold surfaces. The remaining gas species He, CO2, O2, N2 (with a very small tritium concentration) are transferred finally to the Exhaust Detritiation (ED) system for further reduction of the tritium concentration by at least a factor of 1000. The cold trap is heated (473K) and the water vapour passed over two hot iron beds at 823K to “crack” the water. The recovered hydrogen isotopes are stored in cold uranium beds (U-beds) for further processing in AGHS.