Haoshuai Jia

Haoshuai Jia

Auto-generated profile, based on publicly available information

Haoshuai Jia

China Renewable Energy Engineering Institute, Beijing 100120, China

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 July 2025 in Energies
Verified
Journal Article
Open access
PDF file
JHJiang Hai
Jiang Hai
HJHaoshuai Jia
Haoshuai Jia
YQYong Qiao
Yong Qiao
WLWenzhi Liu
Wenzhi Liu
YMYijun Miao
Yijun Miao
CWChang Wen
Chang Wen
This study combines convolutional neural network (CNN) recognition technology, Greenwich engineering software, and statistical yearbook methods to evaluate rural solar, wind, and biomass energy resources in pilot cities in China, respectively. The CNN method enables the rapid identification of the available roof area, and Greenwich software provides wind resource simulation with local terrain adaptability. The results show that the capacity of photovoltaic power generation reaches approximately 15.63 GW, the potential of wind power is 458.3 MW, and the equivalent of agricultural waste is 433,900 tons of standard coal. The city is rich in wind, solar, and biomass resources. By optimizing the hybrid power generation system through genetic algorithms, wind energy, solar energy, biomass energy, and coal power are combined to balance the annual electricity demand in rural areas. The energy trends under different demand growth rates were predicted through the LEAP model, revealing that in the clean coal scenario of carbon capture (WSBC-CCS), clean coal power and renewable energy will dominate by 2030. Carbon dioxide emissions will peak in 2024 and return to the 2020 level between 2028 and 2029. Under the scenario of pure renewable energy (H_WSB), SO2/NOx will be reduced by 23–25%, and carbon dioxide emissions will approach zero. This study evaluates the renewable energy potential, power system capacity optimization, and carbon emission characteristics of pilot cities at a macro scale. Future work should further analyze the impact mechanisms of data sensitivity on these assessment results.

19 October 2026 in Energies
Verified
Journal Article
Open access
PDF file
JHJiang Hai
Jiang Hai
LXLi Xiong
Li Xiong
HJHaoshuai Jia
Haoshuai Jia
GLGuijun Liu
Guijun Liu
RCRongbo Chen
Rongbo Chen
Haoming LiuHaoming Liu
Haoming Liu
Industrial parks serve as the core carriers for low-carbon transition in the industrial sector, while multi-energy complementary integrated energy systems (IESs) represent the key technological pathway for achieving efficient decarbonization in such parks. However, the output volatility of high-penetration renewable energy sources, coupled with the scheduling complexity under carbon emission constraints, poses severe challenges to day-ahead decision-making for park-level integrated energy systems. To address this issue, this paper developed a two-stage distributionally robust optimization (DRO) scheduling model based on the Wasserstein distance. First, an electricity–heat–gas–hydrogen IES architecture is established, and a day-ahead scheduling optimization model is formulated with the objective of minimizing the sum of system operation and maintenance costs, energy purchase costs, tiered carbon trading costs, and renewable curtailment penalty costs. Second, to cope with the uncertainty of wind and solar power outputs, the recourse decisions are parameterized after uncertainty achievement, transforming the original problem into a single-level program that can be directly solved by commercial solvers. Finally, simulation verification is conducted using an aluminum-based new material industrial park as a case study. The results demonstrate that the hydrogen energy storage system can effectively achieve cross-period transfer and efficient accommodation of renewable electricity. Compared with the conventional box-uncertainty robust optimization method, the proposed approach achieves a superior balance between scheduling economy and operational robustness, validating the effectiveness and engineering practicality of the model.