Takuya Ishibashi

Takuya Ishibashi

Auto-generated profile, based on publicly available information

Takuya Ishibashi

High Energy Accelerator Research Organization (KEK)

Research Focus & Metrics

Academic Career Length

20Years (2007-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2013 in Progress of Theoretical and Experimental Physics
Verified
Journal Article
Open access
PDF file
YOYukiyoshi Ohnishi
Yukiyoshi Ohnishi
TATetsuo Abe
Tetsuo Abe
TAToshikazu Adachi
Toshikazu Adachi
KAKazunori Akai
Kazunori Akai
YAYasushi Arimoto
Yasushi Arimoto
ZZZhanguo Zong
Zhanguo Zong
The SuperKEKB project requires a positron and electron collider with a peak luminosity of 8 × 1035 cm−2 s−1. This luminosity is 40 times that of the KEKB B-factory, which operated for 11 years up to 2010. SuperKEKB is an asymmetry-energy and double-ring collider; the beam energy of the positron (LER) is 4 GeV and that of the electron (HER) is 7 GeV. An extremely small beta function at the interaction point (IP) and a low emittance are necessary. In addition, in order to achieve the target luminosity, a large horizontal crossing angle between two colliding beams is adopted, as is a bunch length much longer than the beta function at the IP. This method is called the “nano-beam scheme”. The beam–beam parameter is assumed to be similar to KEKB, the beta function at the IP is 1/20, and the beam currents are twice those of KEKB in the nano-beam scheme. Consequently, the luminosity gain of 40 with respect to KEKB can be obtained.

1 January 2019 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Verified
Journal Article
Closed access
PLP.M. Lewis
P.M. Lewis
IJI. Jaegle
I. Jaegle
HNH. Nakayama
H. Nakayama
AAA. Aloisio
A. Aloisio
FAF. Ameli
F. Ameli
SYS. Yokoyama
S. Yokoyama

23 March 2012 in Journal of Vacuum Science & Technology A
Verified
Journal Article
Closed access
YSYusuke Suetsugu
Yusuke Suetsugu
KKKen-Ichi Kanazawa
Ken-Ichi Kanazawa
KSKyo Shibata
Kyo Shibata
TITakuya Ishibashi
Takuya Ishibashi
HHHiromi Hisamatsu
Hiromi Hisamatsu
STShinji Terui
Shinji Terui
A two-ring electron-positron collider with asymmetric energies—called the SuperKEKB—has been designed by the High Energy Accelerator Research Organization (KEK) as an upgrade of the KEKB B-factory (KEKB), which completed 12 years of operation in 2010. It is anticipated that the SuperKEKB will reach a luminosity of 8 × 1035 cm−2 s−1, which is approximately 40 times larger than that of the original KEKB. The upgrade of the vacuum system is a key factor that will allow the SuperKEKB to achieve unprecedented high performance. Most of the beam pipes, especially in the positron ring, are newly manufactured to manage the electron cloud effect, and to reduce beam impedance, which is essential to keep the low-emittance beam stable. Our design of the vacuum system implements recent technologies and draws on various experiences and studies during the operation of the original KEKB. The basic design is near completion, and manufacturing of beam pipes and the major vacuum components, such as bellows chambers, gate valves and supports, are in progress. The installation of these components will start in 2013 with the aim of commissioning the SuperKEKB in 2014.

13 May 2020 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PDF file
TIT. Ishibashi
T. Ishibashi
STS. Terui
S. Terui
YSY. Suetsugu
Y. Suetsugu
KWK. Watanabe
K. Watanabe
MSM. Shirai
M. Shirai
Movable collimators for the SuperKEKB main ring, which is a two-ring collider consisting of a 4 GeV positron and 7 GeV electron storage ring, were designed to fit an antechamber scheme in the beam pipes, to suppress background noise in a particle detector complex named Belle II, and to avoid quenches, derived from stray particles, in the superconducting final focusing magnets. We developed horizontal and vertical collimators having a pair of horizontally or vertically opposed movable jaws with radiofrequency shields. The collimators have a large structure that protrudes into the circulating beam and a large impedance. Therefore, we estimated the impedance using an electromagnetic field simulator, and the impedance of the newly developed collimators is lower compared with that of our conventional ones because a part of each movable jaw is placed inside the antechamber structure. Ten horizontal collimators and three vertical collimators were installed in total, and we installed them in the rings taking the phase advance to the final focusing magnets into consideration. The system generally functioned, as expected, at a stored beam current of up to approximately 1 A. In high-current operations at 500 mA or above, the jaws were occasionally damaged by hitting abnormal beams, and we estimated the temperature rise for the collimator’s materials using a Monte Carlo simulation code. In order to avoid damage to the jaw, we have started developing a collimator with low atomic number materials.

27 July 2023 in Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Verified
Journal Article
Closed access
ANA. Natochii
A. Natochii
TBT.E. Browder
T.E. Browder
LCL. Cao
L. Cao
GCGiuseppe Cautero
Giuseppe Cautero
SDS. Dreyer
S. Dreyer
KYK. Yoshihara
K. Yoshihara

9 August 2021 in Physical Review Accelerators and Beams
Verified
Journal Article
Open access
PDF file
ANA. Natochii
A. Natochii
SVS. E. Vahsen
S. E. Vahsen
HNH. Nakayama
H. Nakayama
TIT. Ishibashi
T. Ishibashi
STS. Terui
S. Terui
Mitigation of beam backgrounds via collimators is critical for the success of the Belle II experiment at the SuperKEKB electron-positron collider. We report on an improved simulation methodology, which includes a refined physical description of the collimators and beam pipe, our first implementation of collimator tip scattering, and in which the existing beam particle tracking software has been embedded into a new sequential tracking framework. These improvements resolve longstanding discrepancies between measured and predicted Belle II background levels, and significantly reduce the computing time required to optimize the collimation system in simulation. Finally, we report on collimator aperture scans, which confirm the accuracy of the simulation and suggest a new method for aligning the collimators.