Richard E. Harness

Richard E. Harness

Auto-generated profile, based on publicly available information

Richard E. Harness

EDM International, Fort Collins, Colorado, USA

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Ornithological Applications
Verified
Journal Article
Open access
PDF file
JDJames F. Dwyer
James F. Dwyer
APArun K Pandey
Arun K Pandey
LMLaura A McHale
Laura A McHale
RHRichard E Harness
Richard E Harness
Midflight collisions with power lines impact 12 of the world’s 15 crane species, including 1 critically endangered species, 3 endangered species, and 5 vulnerable species. Power lines can be fitted with line markers to increase the visibility of wires to reduce collisions, but collisions can persist on marked power lines. For example, hundreds of Sandhill Cranes (Antigone canadensis) die annually in collisions with marked power lines at the Iain Nicolson Audubon Center at Rowe Sanctuary (Rowe), a major migratory stopover location near Gibbon, Nebraska. Mitigation success has been limited because most collisions occur nocturnally when line markers are least visible, even though roughly half the line markers present include glow-in-the-dark stickers. To evaluate an alternative mitigation strategy at Rowe, we used a randomized design to test collision mitigation effects of a pole-mounted near-ultraviolet light (UV-A; 380–395 nm) Avian Collision Avoidance System (ACAS) to illuminate a 258-m power line span crossing the Central Platte River. We observed 48 Sandhill Crane collisions and 217 dangerous flights of Sandhill Crane flocks during 19 nights when the ACAS was off, but just 1 collision and 39 dangerous flights during 19 nights when the ACAS was on. Thus, we documented a 98% decrease in collisions and an 82% decrease in dangerous flights when the ACAS was on. We also found a 32% decrease in the number of evasive maneuvers initiated within 25 m of the power line along the river, and a 71% increase in the number of evasive maneuvers initiated beyond 25 m when the ACAS was on. Sandhill Cranes reacted sooner and with more control, and experienced substantially fewer collisions, when the ACAS was on. Installation of the ACAS on other high-risk spans, and perhaps on other anthropogenic obstacles where birds collide, may offer a new solution to a long-running conservation dilemma.

1 July 2018
Verified
Book Chapter
Closed access
PDF file
DEDuncan T. Eccleston
Duncan T. Eccleston
RHRichard E. Harness
Richard E. Harness

9 September 2013 in Wildlife Society Bulletin
Verified
Journal Article
Closed access
PDF file
MSMisti K. Sporer
Misti K. Sporer
JDJames F. Dwyer
James F. Dwyer
BGBrian D. Gerber
Brian D. Gerber
RHRichard E. Harness
Richard E. Harness
APArun Pandey
Arun Pandey

16 May 2024 in Oryx
Verified
Journal Article
Open access
PDF file
MKMahmood Kolnegari
Mahmood Kolnegari
MKMohammad Ali Khosravi
Mohammad Ali Khosravi
ABAli Akbar Basiri
Ali Akbar Basiri
MHMandana Hazrati
Mandana Hazrati
JGJose Guerrero-casado
Jose Guerrero-casado
RHRichard Harness
Richard Harness

18 April 2018 in IEEE Industry Applications Magazine
Verified
Journal Article
Closed access
DEDuncan Eccleston
Duncan Eccleston
RHRichard Harness
Richard Harness
MBMason Baker
Mason Baker
From 2002 to 2003, the Colorado Rural Electric Association (CREA ) led the development of avian protection plans (APPs) with avian risk assessments (ARA s) for 21 cooperatives, two municipal utilities, and the Public Service Company of Colorado (now known as Xcel Energy). Making use of the best mapping and data collection tools of the day, these documents offered guidance on avian management and mitigation to improve avian safety and system reliability. These tailored APPs leveraged shared and utilityspecific content to meet the unique needs of each utility, while remaining affordable to small providers. The CREA project leveraged available efficiencies to deliver 24 utilityspecific APPs at a far lower cost than would have been possible had each APP been developed separately. Due to this large-scale, visionary effort, the vast majority of Colorado's power lines are covered by an APP. To our knowledge, no group of independent utilities had developed tailored APPs for more than a decade after the CREA project.