11 April 2023 in Water Science & Technology
Removal of suspended solids from raw water is an essential process in water treatment plants. Conventional sedimentation tanks in water treatment plants occupy a large area and become expensive in urban areas. The use of plate settlers or tube settlers in sedimentation tanks to increase the efficiency and hence reduce the footprint of sedimentation tanks is an economical solution in water treatment. This study investigated the effectiveness of plate and tube settlers compared to conventional settlers in a water treatment plant. A three-dimensional Computational Fluid Dynamics (CFD) model was set up using ANSYS-CFX 17.2. Seven cases (a conventional settler, three plate settlers and three tube settlers) were analysed to compare the settler performances. The maximum removal efficiencies of all solid classes were approximately equal in plate and tube settlers with the same plate spacing and tube depth: around 100%, 67%, 28% and 9% for the solid classes with particle diameters of 41, 17, 9.5 and 5.0 µm, respectively. The settling efficiency remained unchanged with the increase of the plate settling area beyond 60% of the conventional settler area under the given tank and flow conditions. The tube cross-section shape does not affect the particle removal efficiency of a tube settler.
2 September 2021 in Journal of Water and Climate Change
Irrigation water management in the paddy cultivation area under the left bank canal of the Kaudulla reservoir (Kaudulla tank) in the North Central Province of Sri Lanka has become a serious issue due to limited water availability and inefficient water distribution infrastructure at present. Insufficient storage capacities of the village tanks in the cultivation area, low rainfall during some months and regulated inflow from the transbasin diversion to Kaudulla tank have had a significant impact on yield in the two cultivation seasons of the year. In this article, modernization of irrigation infrastructure in the command area was investigated for effective utilization of limited available water. The results of the calibrated and validated Hydrologic Engineering Centre - Hydrologic Modeling System (HEC-HMS) model and Crop Water and Irrigation Requirements Program (CROPWAT) model were used with Water Evaluation and Planning Model (WEAP) to evaluate the water balance and demand to identify the best investment for improving irrigation water supply to maximize the return. Economic analysis was carried out using the net present values for different modernization options. Accordingly, the construction of a new canal system and augmentation of the capacities of village tanks from the present total capacity of 3.8–20 MCM was found to be the most appropriate option. This intervention will increase the income from yield by 205 million with a payback period of 12 years in the Yala season.