Li Jiang

Li Jiang

Auto-generated profile, based on publicly available information

Li Jiang

Yanchong Expressway Construction Office of Hebei Province, Zhangjiakou City, Hebei Province, 075000, China

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2015 in Journal of Management in Engineering
Verified
Journal Article
Closed access
LJLi Jiang
Li Jiang
RLRobert Leicht
Robert Leicht

13 May 2014
Verified
Conference Paper
Closed access
LJLi Jiang
Li Jiang
RLRobert Leicht
Robert Leicht
GKGül E. Kremer
Gül E. Kremer
The concept of "constructability" has been raised to optimize construction knowledge and experience in the design phase of construction projects to improve project performance. Previous research demonstrated the feasibility of an automated, rule-based constructability review through BIM implementation. The current work investigates the elicitation of constructability knowledge to achieve the automated process. With a case study, two frequently used knowledge elicitation methods—interview and document analysis—were applied to collect constructability knowledge on formwork selection for a concrete building project. Advantages of each technique indicate the need for combining the two elicitation methods as a means of triangulation to establish a comprehensive and accurate knowledge base for an automated, rule-based constructability review.


29 November 2015
Verified
Conference Paper
Open access
LJLi Jiang
Li Jiang
NTNicholas Tay
Nicholas Tay
SZSeif Zadeh
Seif Zadeh
GBGary Bulluss
Gary Bulluss

1 January 2021 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
ZZZhigang Zhang
Zhigang Zhang
SQShangwen Qu
Shangwen Qu
YYYang Yang
Yang Yang
GZGuoxiang ZHANG
Guoxiang ZHANG
XZXin Zhang
Xin Zhang
LJLi Jiang
Li Jiang
The special driving environment of highway extra-long tunnels causes high operational risks and difficult escape. The establishment of a sound emergency escape support system is essential for drivers to escape safely in risky accidents. Based on the factors such as the type and severity of tunnel operation risks, this paper studies and puts forward the level of extra-long tunnel operation risk management and the requirements for safe emergency escape of relevant personnel under different levels, and establishes and improves the composition of the extra-long tunnel emergency support system and the function, location and spacing of each facility in the subsystems. Considering the condition of extra-long tunnels, the research conclusions provide a scientific basis for emergency escape management and establishment technology, and proposes a safer support system for emergency escapes.

24 May 2016
Verified
Conference Paper
Closed access
LJLi Jiang
Li Jiang
MNMiaomiao Niu
Miaomiao Niu
RLRobert Leicht
Robert Leicht
JMJohn Messner
John Messner
Digital models incorporating 3D geometry and information attributes are becoming a standard for industrial facility and commercial building design. Despite the advancements in technologies to develop design models, there is an opportunity to better leverage models within facility construction processes. Moreover, there is a need for a comprehensive understanding of construction information requirements that are not presently available, but could be delivered via a model. This presents an opportunity to create coordinated industry guidelines and a process for leveraging model content through the construction phase. This paper presents a taxonomy for digital model uses within construction. Focus group workshops and case studies were applied to capture the current model uses and to identify unmet model use opportunities. Data was collected, analyzed, and compiled into a structured catalog of construction model uses, along with the benefits and barriers to implementation. The taxonomy provides an approach to help an organization identify current model use status and the near-term future opportunities of using virtual models to further meet construction needs. The paper concludes with discussion of how a planning approach and implementation guidelines will be developed.