Coordinated operation of various energy sources has drawn the attention of many power producers worldwide. In this paper, a Concentrating Solar Power Plant (CSPP) along with a wind power station, a Compressed Air Energy Storage (CAES) unit, and a Demand Response Provider (DRP) constitute the considered Hybrid Power Producer (HPP). In this regard, this paper deals with the optimal participation of the mentioned HPP in the Day-Ahead (DA), and intraday electricity markets by benefiting from the joint configuration of all accessible resources. To attain risk-averse strategies in the suggested model, Conditional Value-at-Risk (CVaR) based on the ε-constraint technique is employed, while its efficiency is validated compared to the previously applied method to such problems. On the whole, the main contributions of this work lie in: 1) proposing a novel model for optimal behavior of a CSPP-based HPP in DA, and intraday markets using a three-stage decision-making architecture, and 2) developing a bi-objective optimization framework to improve the functioning of the risk-constrained algorithm. Simulation results reveal that taking advantage of the CSPP in the intraday market, and coordinated operation of all resources not only enhance the profitability of the system but also lessen the associated risk compared to the previous models.
26 March 2019 in IET Generation, Transmission & Distribution
This study scrutinises the impacts of demand‐side resources (DSRs) on the power system reliability via a novel multi‐target generation maintenance (GM) model. The nominated model uses the lexicographic preferences to hierarchically consider the environmental issues, economics, and reliability of power systems. In this regard, the produced emission, which reflects the per unit produced pollutant values in different locations, is minimised. Taking into account the environmental constraints, the total incurred expenditures, including operating and maintenance costs, reserves costs, and total incentives are also minimised. Subsequently, the GM problem considering the correlation constraints is handled while the reliability index, the average net reserve value, is maximised over the scheduling horizon. The DSRs improve the system reliability such that the total costs, and emission level, do not exceed the situation in which DSRs are not available. The GM scheduling is a highly complicated problem and considering DSRs makes it even more complicated. To handle this problem more efficiently, appropriate linearisation technique is used, while the proposed model is formulated in GAMS modelling language. To evaluate the capability of DSRs in system reliability improvement, the modified 24‐bus IEEE‐RTS is conducted. Results indicate that by selecting proper location and incentives, significant improvement is obtained.