18 June 2020 in IEEE Transactions on Smart Grid
Load redistribution (LR) attacks represent a major cyber threat to the power grid that can result in branch overloads and even cascading failures in the transmission network by injecting false data to load bus power injection and line power flow measurements. While the mechanism and defense strategies have been well studied for single-occurrence (i.e., discrete) LR attacks, this paper focuses on a yet unexplored category of LR attacks, namely, the continuous LR (CLR) attack, which continuously injects time-varying false data to one or more bus and branch measurements within the system for a certain period of time. To cope with the potentially ever-changing targeted branches (i.e., the branches under attack) and system vulnerability features caused by CLR attacks, this paper takes a different route from the traditional LR defense and mitigation approaches. We propose a novel correlation chain model to capture the vulnerability correlations among branches under the CLR attack. Then, a dynamic sequential-mining algorithm (DSMA) with top-k structure is proposed based on the specific nature of the CLR attack, to mine the historical SCADA measurement database, extract vulnerable branch sequences, and identify the most suitable branches to defend preventively. Simulation studies are conducted on IEEE RTS-96 system to evaluate the effectiveness of the proposed approach in terms of increasing attack costs for the attackers and reducing the potential impacts of CLR attacks.
10 July 2020 in IEEE Transactions on Smart Grid
The load redistribution (LR) attack, as a special type of false data injection attacks, aims to distort the results of the security-constrained economic dispatch (SCED) and drive the system to non-optimal or even unsecure operating conditions by injecting false data to the node power injection and branch power flow measurements. The LR attack represents a great danger to the safe and reliable operation of the current power grid where the physical infrastructure is increasingly intertwined with cyber components. In this paper, we propose a novel pre-overload vulnerability graph (POV-graph) approach to systematically assess, evaluate, and quantify the system vulnerability under an LR attack. The proposed approach is formulated based on the specific overloading mechanism of the LR attack as well as their cascading patterns. A set of case studies are performed on the IEEE 39-bus, 118-bus, and RTS-96 systems to validate the effectiveness of the proposed approach. Simulation results have shown, for the first time that, by revealing the vulnerability correlations among branches, the proposed approach allows the system operator to better utilize the defense resources and focus on strengthening a limited number of vulnerable branches to enhance the system’s overall security against LR attacks.
3 March 2022 in IEEE Transactions on Smart Grid
This letter develops a new bilevel optimization model to construct false data injection attack based on pre- and post- dispatch. In order to enhance the attack concealment, the proposed bilevel model can minimize the variation of uploaded measurements between pre- and post-attack before dispatching, after which the attack can lead the system to an uneconomic and insecure operating state after dispatching. Simulation results validate the effectiveness of the proposed bilevel model in term of operating cost and network overloads.
20 June 2022 in IEEE Systems Journal
A topology attack, as a special class of false data injection attacks, tampers with topology information of a system to mislead the decision of the control center. This article conducts an in-depth study on topology attacks that aim to interfere with the judgment in topology information and pose potential damage by tampering with measurement data and protection information on branches, namely, protection-branch measurements-based topology attacks (PBT attacks). To achieve PBT attacks in actual networks, we study the protection settings and mechanisms in term of branches including transformers and transmission lines. Then, for the first time, we develop a bilevel model based on the protection configuration from the perspective of security-constrained economic dispatch. Meanwhile, since a bilevel model is constructed against dc state estimation, a conversion method in constructing attack vectors under PBT attacks against ac power system is proposed, which makes PBT attacks more suitable for actual power systems and more concealed. In a set of case studies on an IEEE 14-bus system, the simulation results verify the effectiveness of the model we proposed, analyze the vulnerability of network under PBT attacks, and then identify some critical branches that are defended to cope with PBT attacks. In addition, the comparison between PBT attacks and traditional cyber-overloaded attacks also shows a stronger threat of the studied attacks.
27 May 2019 in IEEE Access
As an indispensable part of metro traction power supply system, the metro overhead contact system (OCS) is complex in composition and has various causes of faults, so its fault prevention is too complicated to be handled by using traditional methods. However, over the last few years, the fault data of metro OCS has been through an explosive growth. Consequently, the method of high utility mining, which is capable of pointedly mining fault association rules from historical fault data, is adopted to address the issue. According to the fault association rules, once the precursor of the specified fault occurs, we can immediately conduct preventive maintenance to achieve the purpose of fault prevention. In this paper, we proposed a novel fault prevention model for metro OCS. Firstly, we proposed a concept hierarchical database structure with a detailed encoding method, which can efficiently store the massive fault data and facilitate the subsequent mining. And then an improved algorithm for mining multiple-level top-K high utility fault-sets (MTHU) for metro OCS is proposed. At last, a case study is conducted and the mining result is analyzed to reveal the inner connections between faults. And based on the analysis result, the detailed preventive maintenance suggestions is given to effectively achieve fault prevention for OCS.