1 January 2021 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. To develop a technology to increase the oil recovery of formations using injection of polymer compositions. Methodology. For this study, practical methods were used such as enhanced oil recovery using stimulating technologies, technology using polymer systems based on a water-soluble polymer acrylamide, and emulsion-polymer technology. To achieve the conformance control, which was a prerequisite for testing, a thorough selection of wells was carried out, as well as an analysis of their hydrodynamic connection. Findings. As a result of using the method for limiting water inflows in the development of oil-bearing formations, redistribution of filtration channels, and a decrease in the production of fossil water as well as stabilisation of water cut were achieved. Originality. The scientific novelty of the study is the withdrawal of wells that are able to redistribute the volume of water injection at perforation intervals. Increased sweep efficiency and pressure at the wellhead at the beginning and at the end of the conformance control indicate a decrease in the conductivity of high-permeability formation intervals. Practical value. Application of the proposed technology for limiting water inflows will make it possible to develop low-permeability interlayers with filtration flows. The wells brought to a stable production rate during the study will ensure a decrease in formation water production and the water cut of the produced products, as well as stabilisation of the water cut over a certain period.
25 March 2021 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
KIKarshi Engineering and Economic Institute
Karshi Engineering and Economic Institute
AUAtyrau University of Oil and Gas named after Safi Utebayev
Atyrau University of Oil and Gas named after Safi Utebayev
+3
This article provides a technical and economic assessment of the effectiveness of the application of physical impact on a productive formation in one of the fields in Western Kazakhstan. The world experience of using the technology of physical stimulation in the fields shows high technological efficiency. Also, in order to optimize oil production, as a result of physical impact, changes in oil viscosity, an increase in oil production and a decrease in water cut were calculated. All the Cretaceous horizons have good reservoir properties, however, the high viscosity of oil and poor consolidation of the rocks composing the horizons do not allow for the full recovery of the product. Determination of phase permeabilities in the oil-water system was carried out in laboratory conditions with joint stationary filtration. According to the calculations performed in order to optimize oil production, as a result of physical impact, the oil viscosity changed to a value of 430 cP from 700 cP, the value decreased almost 2 times. There is also an increase in oil production and a decrease in water cut.
25 June 2021 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
BLBeineu-Shymkent Gas Pipeline Llp
Beineu-Shymkent Gas Pipeline Llp
NANational Academy of Sciences of Azerbaijan
National Academy of Sciences of Azerbaijan
+1
Currently, the National gas supply operator in Kazakhstan pays special attention to the rational use of natural gas for its own and technological needs, while maintaining the optimal management of the gas transportation system, taking into account the specific technical situation of the equipment. Energy efficient management of gas pipelines is one of the priority directions for optimizing gas costs. The use of innovative methods of energy-saving technologies during the operation of the gas transmission system, an increase in the efficiency of gas-pumping units, as well as the implementation of automated energy saving control systems, will significantly increase the efficiency of gas transportation.
25 June 2021 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
KIKarshi Engineering and Economic Institute
Karshi Engineering and Economic Institute
+2
This article discusses a digital geological model, the transfer of borehole data to the geological grid, and the modeling of the technology of alternating steam and water injection. Alternating injection involves the cyclic injection of steam and water into an injection well in high-viscosity oil fields. The essence of this technology is that during the steam injection for 2-4 months, the formation warms up, leading to a decrease in viscosity and an increase in oil mobility. Then comes the period of water injection, during which the production of already warmed oil continues and the formation pressure is maintained. For digital geological modeling, the following data were collected, processed and prepared: a list of wells that open the object of modeling, coordinates of wellheads, well altitudinal data, inclinometry of well trajectories, GМS data on wells, analysis of wells drilled with core sampling, and digitized seismic data (structural surfaces on the roof of stratigraphic horizons, parameter maps, contact surfaces, faults, structural maps on the roof of target horizons with faults, isochron maps, velocity maps).
28 February 2023 in Naukovyi Visnyk Natsionalnoho Hirnychoho Universytetu
Purpose. Establishment of regularities of variability of pressure dynamics in the reservoir and development on this basis of methods of control and regulation of hydrocarbon production. Methodology. To achieve this goal, experimental studies were conducted, and the results of the experiments were summarized. Findings. Pressure distribution functions for stationary fluid inflow in two planes have been established, which allow monitoring and management of mining operations, especially at late stages of development. Originality. Based on the established regularities, a model of pressure distribution in the reservoir in a two-dimensional plane has been created. An experimental study of the pressure distribution in the reservoir was carried out, which allowed us to remove the characteristics of the pressure distribution along the axis of the segment of the oil reservoir under varying boundary conditions. Practical value. A mathematical model of pressure distribution processes along the angle of inclination is proposed, which allows determining the effectiveness of flooding. The influence of the deformability of the formation, the location of the well relative to its impenetrable roof and sole, the length of the horizontal trunk and the power of the opened formation on the magnitude and intensity of the inflow to the horizontal well is estimated.
8 November 2024 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
SUSamarkan State University
Samarkan State University
+6
This work is dedicated to the analysis and development of an integrated production system that combines wells and surface facilities to select the optimal operating mode for equipment. The main focus is on studying data analysis methods, as well as collecting and processing information, which ensures high accuracy in process control and optimal use of technological capabilities. The integration of data from various levels of the production chain, from the well to the surface facilities, opens up new opportunities for optimizing equipment performance and improving resource management quality. Integration of wells and surface facilities – The effective integration of wells and surface facilities is crucial for optimizing production processes, minimizing operational costs, and reducing environmental impact. Integrated management systems allow the automation of many processes, providing continuous monitoring of operating parameters, automatic adjustment of settings, and supplying data for quick decision-making. This includes real-time data collection, analysis, and the use of the obtained information to select optimal operating modes, which helps improve both overall efficiency and safety in production processes. In the modern oil and gas industry, the efficient use of equipment at all stages of hydrocarbon production is of particular importance. Optimizing the operation of wells and surface facilities is a key aspect for increasing economic efficiency and reducing environmental impact. In this regard, the development and application of integrated systems that enable real-time control and adaptation of equipment operating modes has become a relevant and significant task.