Takao Masumoto

Takao Masumoto

Auto-generated profile, based on publicly available information

Takao Masumoto

National Institute for Rural Engineering

Research Focus & Metrics

Academic Career Length

21Years (2006-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 February 2008 in Hydrological Processes
Verified
Journal Article
Closed access
PDF file
TMTakao Masumoto
Takao Masumoto
PHPham Thanh Hai
Pham Thanh Hai
KSKatsuyuki Shimizu
Katsuyuki Shimizu

1 November 2006 in Paddy and Water Environment
Verified
Journal Article
Closed access
PDF file
TMTakao Masumoto
Takao Masumoto
TYTakeo Yoshida
Takeo Yoshida
TKTomijiro Kubota
Tomijiro Kubota

1 January 2006 in PROCEEDINGS OF HYDRAULIC ENGINEERING
Verified
Journal Article
Closed access
PHPham Thanh Hai
Pham Thanh Hai
TMTakao Masumoto
Takao Masumoto
KSKatsuyuki Shimizu
Katsuyuki Shimizu

21 June 2016 in Irrigation and Drainage
Verified
Journal Article
Open access
PDF file
TMTakao Masumoto
Takao Masumoto
TYTakeo Yoshida
Takeo Yoshida
RKRyoji Kudo
Ryoji Kudo
This paper presents a basin‐scale approach to irrigation planning for use in areas with scarce hydrological and meteorological data. We review the past development of cascade irrigation facilities in Cambodia's Kep Province and present the results of applying a distributed water circulation model that incorporates agricultural water use in Cambodia's Pursat River Basin. Basic hydrological and meteorological data are scarce for these areas, partly as a result of the Cambodian civil war. Although 70% of overall water use is for agriculture, irrigation rates in many areas of monsoonal Asia are low and farming depends mainly on rainwater, even in basins where paddy fields are dominant and water resources are abundant. Moreover, basic hydrological and meteorological data are scarce in these areas. Past irrigation planning proposals in these areas have not specified the required volumes of water or the necessary capacities of irrigation facilities. Our consideration of irrigation projects in the Pursat River Basin, based on meteorological data inputs estimated by using a general circulation and/or climate change model, showed that basin‐scale irrigation planning can be applied despite the scarcity of data. Application of the results of long‐term climate change modelling by Japan's Meteorological Research Institute and a distributed water circulation model developed by Institute for Rural Engineering, NARO (NIRE), show that it is possible to model and use basic data when observational data are inadequate. © 2016 The Authors. Irrigation and Drainage Published by John Wiley & Sons Ltd.

24 January 2008 in Paddy and Water Environment
Verified
Journal Article
Closed access
PDF file
TMTakao Masumoto
Takao Masumoto
HTHitoshi Toritani
Hitoshi Toritani
MTMinoru Tada
Minoru Tada
ASAkira Shimizu
Akira Shimizu

8 September 2016 in Paddy and Water Environment
Verified
Journal Article
Closed access
PDF file
TMTakao Masumoto
Takao Masumoto