The article deals with the ways of dealing with the concept of drinking water supply in the event of emergencies and crisis situations. The contribution defines concepts related to crisis planning, describes preventive measures to ensure a prompt resolution of a situation, solution to minimize the damage caused by the incident and, last but not least, the possible ways of ensuring the supply of drinking water in emergency situations.
This paper focuses on the possibility of linking Project Management and Facility Management that would result in an operationally efficient design of a development project. Project management tools are used during a construction project when an investment plan is implemented from the idea all the way until it is put into operation. Adding facility management to a construction project leads to a new insight into the project development which works with suggestions of the future operator of the facility from the very first considerations of the investment. The paper aims to highlight the benefits that a project would gain by integrating there two management areas.
The paper is focused on questions of building life cycle costing determination (LCC). Current situation concerning the LCC determination in the world is analysed and it is stated here what documents deal with these questions and at the same time also the ISO 15 686 standpoint is stated here. To point out to the importance of the cost determination in this field which is born already with investment project preparation is the aim of this paper.